Laserfiche WebLink
<br />DAction <br /> <br />CITY OF PARIS, TEXAS <br />CITY COUNCIL AGENDA REQUEST <br />MEETING DATE: 15-14-2007 <br /> <br />D Discussion ~Information DRefer to: <br /> <br />SUBMITTED BY: <br />I Engineering Department <br /> <br />DESCRIPTION: <br />A REPORT ON THE TRAIL DE PARIS PEDESTRIAN BRIDGE OVER US 271 <br />SOUTH AT LOOP 286. <br /> <br />BACKGROUND INFORMATION: <br /> <br />This bridge will be required in order to connect the proposed 0.8 mile project trail <br />extension to the existing Trail de Paris. The "Friends of the Trail" have obtained <br />$90,000 from three different foundations in order to purchase and install a <br />pedestrian bridge that meets TXDOT standards. Several different people and <br />groups have donated time to assist with the project including Earl Erickson, Hayter <br />Engineering and Clottey Engineering. An agreement is being drafted by TXDOT <br />that will define who is responsible for maintenance and inspection of the bridge. <br />Surveying information and structural information is being gathered in order to <br />determine how much money will be needed to do the complete project. <br /> <br />FISCAL AUTHORITY: <br />BUDGETED: <br />GRANT: <br />BOND / CO <br />Other: <br /> <br />Account #: <br />Account #: <br />Account #: <br /> <br />LEGAL REVIEW: <br /> <br />I <br /> <br />MANAGER'S RECOMMENDATION: <br /> <br />r. . <br />