Laserfiche WebLink
<br />Computer <br />Software <br /> <br />Computer Aided Dispatch / Mobile Data <br /> <br />Computer Information Systems CAD 1 $425,901 $425,901 <br />Citrix Server and Client License 15 $280 $4,200 <br />Crystal Reports License 1 $464 $464 <br />Acronis Backup/Restore License 4 $750 $3,000 <br />Firehouse Mgmt Server License 1 $28,000 $28,000 <br />Symantec Antivirus License 29 $32 $928 <br />OS - Microsoft Enterprise (Settleup) <br />Server 2003 4 $661 $2,644 <br />SOL Server 1 $736 $736 <br />Core CAL (OS, Exchange, SOL, Server) 25 $503 $12,575 <br />Software Subtotal $478,448 <br /> <br />Number Cost Each Extended Cost <br /> <br />Computer <br />Hardware <br /> <br />Primary Server - Dell Poweredge Server <br />w/Gold Support and Spare HD 1 $9,300 $9,300 <br />Support Servers - Dell Poweredge Server <br />w/Gold Support and Spare HD 3 $6,300 $18,900 <br />EMC 3.5 Tb SAN, Spare HD w/Brocade Fiber <br />Channel Switch 1 $11,600 $11,600 <br />Server Rack w/Fans 1 $2,000 $2,000 <br />3 Com Switch w/ 4 Copper GBIC 1 $1,700 $1,700 <br />Dell Latitude 131 Laptop (Includes Spare) w 3 <br />yr Gold Support 15 $1,320 $19,800 <br />Vehicle Laptop Mounts (Includes Spare) 15 $300 $4,500 <br />Fiber/Copper Cabling; Mise Parts $750 <br />Vehicle UPS CharQe Guards 25 $90 $2,250 <br />ComputerHardware Subtotal $70,800 <br /> <br />Mobile <br />Data <br /> <br />MDS Mercury 900 Mhz Data Radio w!AVL <br />and installation 1 $159,063 $159,063 <br />Netmotion Software License/Installation <br />Coverage Analysis!RF Study! Project <br />Management <br />MDS Validation, Engineering & Travel <br />MDS Mercury 900 Mhz Access Point 5 <br />Motorola 49400 PTP 4.9 Ghz Backhaul 3 $7,500 $22,500 <br />Upgrade/Stabilization of Towers $1,000 <br />New Cabling (WEWT & PO) $1,600 <br />Electrical Work (AW,EEWT, DPS,WEWT) $2,000 <br />Power Cyclers/Switches 3 $350 $1,050 <br />Backup 2.4 Ghz Radios (FS1 to DPS, PD to <br />EEWT, CH to AW) 3 $500 $1,500 <br />Mobile Data Subtotal ..$1.86,713 <br /> <br />Project Subtotal ~7~7,961 <br />Contingency (6% of Total Project) $44,278 <br />Project Management $12,000 <br />Project Total $794,239 <br /> <br />- r <br />