Laserfiche WebLink
ARCHITEXAS <br />Architecture, Planning and Histgric Preservation, lne, <br />April 16, 2007 <br />Lisa Wright <br />Director of Community Development <br />City of Paris <br />PO Box 9037 <br />Paris, Texas 75461 <br />RE: Proposal for Historic Preservation Consultation Services -Industrial Survey <br />Dear Ms. Wright: <br />Please accept this Historic Preservation Consulting Services proposal for the survey of industrial <br />properties in Paris, TX. Based on our past discussions, previously-conducted surveys, and a <br />preliminary tour of sites, we believe we have an understanding of the scope involved. <br />Paris' historic industrial areas developed with relation to various rail. lines. We plan to spend one <br />day conducting a windshield survey of Paris to locate all industrial areas to be included in the <br />survey and to meet briefly with city representatives. The three primary areas we have identified <br />thus far for the industrial survey center on the city's two depots, Union to the west and Texas & <br />Pacific to the south, and the old Swift Poultry and Gulf Refrning complex at N, plain and Santa <br />Fe. If you believe there are additional areas of interest, please let us know and we will adjust this <br />proposal. <br />Scope and Deliverables <br />Architexas will provide an historic resource survey of the three above-mentioned areas as well as <br />any other areas identified with the windshield survey. The survey documentation will be <br />consistent with survey forms previously submitted for the Commercial, Church Street and Pine <br />Bluff Surveys and will include representative digital photography of the primary exterior <br />facade(s) of each building and of the surrounding context. Survey data will be entered into the <br />database previously developed for Paris survey projects. <br />The City will be provided with two hard copies of the printed survey forms and the electronic <br />data on compact disk. A letter summarizing our findings, and making recommendations for <br />historic designations in these industrial areas will accompany the final survey materials. <br />Schedule <br />Architexas proposed to complete this project within 60 days of being given anotice-to-proceed. <br />Fee <br />Architexas proposes to complete the scope-of--work for slump-sum fee of $6,000.00 including <br />reimbursable expenses. <br />ExHi~~T~ <br />