My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-C Awarding Demolition Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
12 December
>
2007 12-10
>
11-C Awarding Demolition Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2007 2:15:13 PM
Creation date
12/7/2007 2:15:11 PM
Metadata
Fields
Template:
AGENDA
Item Number
11-C
AGENDA - Type
RESOLUTION
Description
Awarding contract for demolition and disposal of substandard structures in the City of Paris.
AGENDA - Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of the <br />work area. Provision of safety includes use of appropriate barricades, traffic control, <br />control of the use of equipment near traffic or pedestrians, and provision of other <br />controls and warnings as needed or as specified by the Work Order. <br /> <br />C. Because time is of the essence in the filing of liens after demolition, Work Orders <br />should be returned to OWNER immediately upon completion of demolition. Work <br />Orders will not be considered CONTRACTOR's bills-they are used solely for the <br />purpose of advising CONTRACTOR of the nature of work necessary at each <br />location and for assisting OWNER in filing liens. <br /> <br />1.02 DEMOLITION <br /> <br />A. Demolition shall include the removal of only those exact items specifically set out <br />in the Work Order. <br /> <br />B. Overall safety and adverse impact to the neighborhood shall be considered a <br />priority. CONTRACTOR shall provide demolition within hours which are reasonable <br />to the conditions of the neighborhood, be cognizant and make provisions to control <br />excessive dust, and secure the area for the overall safety of operations as is <br />defined within these Specifications. CONTRACTOR shall not leave the work site <br />when portions of a structure or other items are in a dangerous condition. Such <br />conditions may require posting a guard or continuing the demolition until the <br />condition is relieved. <br /> <br />C. Demolition shall follow good construction practices. It is the intent of OWNER to <br />remove the standing hazard as quickly as possible, and CONTRACTOR should <br />attempt to satisfy this. This may involve the processes of pushing, breaking, or <br />otherwise reducing standing components into a pile or piles of debris. <br /> <br />Any form and method of demolition will be accepted as long as it conforms to good <br />practice, the method is safe, CONTRACTOR has a history of successful <br />applications, and the method is relative to a particular job provided by the <br />Specifications. OWNER reserves the right to forbid a specific method when <br />CONTRACTOR is inexperienced, is wishing to try experimental techniques or <br />practices, or is proposing a technique which is dangerous to the surrounding <br />neighborhood. <br /> <br />D. Equipment and tools left on the property are the responsibility of CONTRACTOR. <br />OWNER shall not be responsible for theft, damage, or adverse use of the <br />equipment. <br /> <br />E. Mature and protected trees found on a property shall be protected. Contractors shall <br />work around the tree carefully to prevent damage to the tree and its root system. <br />Sapling trees and sprouts may be removed only if they are found in a path needed <br />for access to the structure. <br /> <br />T Y---T-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.