Laserfiche WebLink
B. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of the <br />work area. Provision of safety includes use of appropriate barricades, traffic control, <br />control of the use of equipment near traffic or pedestrians, and provision of other <br />controls and warnings as needed or as specified by the Work Order. <br />C. Because time is of the essence in the filing of liens after demolition, Work Orders <br />should be returned to OWNER immediately upon completion of demolition. Work <br />Orders will not be considered CONTRp,CTOR's bills-they are used solely for the <br />purpose of advising CONTRACTOR of the nature of work necessary at each <br />location and for assisting OWNER in filing liens. <br />1.02 DEMOLITION <br />A. Demolition shall include the removal of only those exact items specifically set out <br />in the Work Order. <br />B. Overall safety and adverse impact to the neighborhood shall be considered a <br />priority. CONTRACTOR shall provide demolition within hours which are reasonable <br />to the conditions of the neighborhood, be cognizant and make provisions to control <br />excessive dust, and secure the area for the overall safety of operations as is <br />defined within these Specifications. CONTRACTOR shall not leave the work site <br />when portions of a structure or other items are in a dangerous condition. Such <br />conditions may require posting a guard or continuing the demolition until the <br />condition is relieved. <br />C. Demolition shall follow good construction practices. landt CONTRAC OR should <br />remove .the standing hazard as quickly as possible, <br />attempt to satisfy this. This may involve the processes of pushing, breaking, or <br />otherwise reducing standing components into a pile or piles of debris. <br />Any form and method of demolition will be accepRdhasoag h story nofr suc~essfudl <br />practice, the method is safe, CONTRACTO <br />applications, and the method is relative to a particular job provided by the <br />Specifications. OWNER reserves the right to forbid a specific method when <br />CONTRACTOR is inexperienced, is wishing to try experimental techniques or <br />practices, or is proposing a technique which is dangerous to the surrounding <br />neighborhood. <br />D. Equipment and tools left on the property are the responsibility of CONTRACTOR. <br />OWNER shall not be responsible for theft, damage, or adverse use of the <br />equipment. <br />. Mature and protected trees found on a property shall be protected. Con root sr stem! <br />E <br />work around the tree carefully to prevent damage to the tree and its y <br />Sapling trees and sprouts may be removed only if they are found in a path needed <br />for access to the structure. <br />