My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-C2 Oncor Electric petition Ord.
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
01 January
>
2008 01-28
>
05-C2 Oncor Electric petition Ord.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2012 1:50:05 PM
Creation date
1/24/2008 4:19:18 PM
Metadata
Fields
Template:
AGENDA
Item Number
05-C2
AGENDA - Type
ORDINANCE
Description
Oncor Electric Co9mpany petition to modify its lighting service tariff.
AGENDA - Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PETITION OF ONCOR ELECTRIC DELIVERY COMPANY LLC <br />TO MODIFY LIGHTING SERVICE TARIFF <br />PURSUANT TO THE ENERGY POLICY ACT OF 2005 <br />TO THE HONORABLE GOVERNING BODY OF EACH MUNICIPALITY WITH <br />ORIGINAL JURISDICTION OVER THE RATES OF ONCOR ELECTRIC DELIVERY <br />COMPANY LLC: <br />NOW COMES Oncor Electric Delivery Company LLC ("Oncor") and files this request <br />to: 1) close its lighting service tariff to new mercury vapor installations effective March 1, 2008, <br />for street lighting and outdoor lighting service; and 2) implement a plan to replace mercury vapor <br />ballasts and fixtures with high pressure sodium units when the fixture and/or ballast must be <br />changed, and in support thereof would respectfully show as follows: <br />I. BACKGROUND <br />The energy conservation standards that the U.S. Congress prescribed in the Energy Policy <br />Act of 2005 ("EPACT 2005") specify that mercury vapor lamp ballasts shall not be <br />manufactured or imported after January l, ,2008. Because of this ban on mercury vapor ballasts <br />effective January l, 2008, Oncor proposes to: 1) close its tariffs for new mercury vapor <br />installations effective March 1, 2008; and 2) implement a plan to replace mercury vapor fixtures <br />with high pressure sodium fixtures when the fixture and/or ballast must be changed. <br />The relevant portion of the tariff which Oncor proposes to modify in this proceeding is <br />found at Section 6.1.1.6 - Lighting Service. Oncor would note that the proposed changes apply <br />both to Street Lighting Service (Sheet 6, pages 1-5), and Outdoor Lighting Service (Sheet 6, <br />pages 6-7), and a copy of the proposed tariff sheets are included as Attachment A. Although the <br />Outdoor Lighting Service offering is already closed to new customers, that portion of the tariff <br />will also be modified to set out the replacement chart for existing mercury vapor installations. <br />The replacement chart for the street lighting service and outdoor lighting service is identical, as <br />follows: <br />1 <br />EXHIBIT,g. <br />. ~ 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.