Laserfiche WebLink
Tariff for Retail Delivery Service <br />Oncor Electric Delivery Company LLC <br />6.1.1 Delivery System Charges Sheet: 6 <br />Applicable: Areas Subject to Original Jurisdiction Page 6 of 7 <br />Effective Date: March 1, 2008 Revision: Two <br />Outdoor Lighting Service (CLOSED) <br />AVAILABILITY <br />Applicable to Competitive Retailers for unmetered lighting service supplied exclusively to one or more existing outdoor <br />lamps as specified below operating automatically from dusk to dawn. <br />Not applicable to street lighting. <br />MONTHLY RATE <br />I. Unmetered Facilities <br />Rnarri 1 inhfe <br />Type <br />Watts <br />kWh <br />Lumens <br />Facilities Charge <br />Mercury Vapor <br />(See Note 1) <br />175 <br />70 <br />7,900 <br />$ 7.10 <br />400 <br />150 <br />21,000 <br />$10.85 <br />Sodium Vapor <br />100 1 <br />40 <br />9,500 <br />$ 6.75 <br />200 <br />80 1 <br />22,000 <br />$ 9.45 <br />jvurc i. vu ... Ndny will wuurruC w nrdurtdur cxwuny rvrercury vapor instaiiauons ana will, at uompanys opuon, Insiall a Metal maiiae <br />ballast in place of a failed Mercury Vapor ballast. As existing fixtures are damaged and must be replaced, Retail Customer will have the <br />option to switch its service to another lamp type as specified in Mercury Vapor Fixture Replacement Schedule below or cancel service at <br />no cost. <br />1:1-11 inhfe <br />Type <br />Watts <br />kWh <br />Lumens <br />Facilities Charge <br />Metal Halide <br />250 <br />100 <br />25,000 <br />$12.55 <br />400 <br />160 <br />36,000 <br />$15.10 <br />Sodium Vapor <br />100 <br />40 <br />9,500 <br />$ 9.10 <br />250 <br />100 <br />27,000 <br />$11.70 <br />400 <br />160 <br />50,000 <br />$14.95 <br />II. System Benefit Fund: <br />$0.000655 per kWh, See Rider SBF <br />III. Transition Charge: <br />See Rider TC <br />IV. Nuclear Decommissioning Charge: <br />$0.000147 per kWh, See Rider NDC <br />V. Transmission Cost Recovery Factor: <br />Not Applicable <br />VI. Excess Mitigation Credit: <br />See Rider EMC <br />VII. State Colleges and Universities Discount: <br />See Rider SCUD <br />VIII. Other Charges or Credits: <br />Extra Spans: Plus $2.85 per span of secondary line installed hereunder in excess of one span per light. <br />