Laserfiche WebLink
EXHIBIT A <br />TARIFF FOR GAS SERVICE ATMOS ENERGY CORP., <br />MID -TEX DIVISION <br />RIDER: <br />Rider GCR - Gas Cost Recovery <br />APPLICABLE TO: <br />Entire System <br />REVISION: <br />DATE: <br />EFFECTIVE DATE: <br />PAGE: 3 OF 3 <br />October 1, 2008 <br />The Pipeline Cost to be billed is determined by multiplying the Mcf or MMBtu used by the <br />appropriate PCF. The Pipeline Cost is determined to the nearest whole cent. <br />19 <br />