My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14 Council objective; Nuisance abatement
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
06 June
>
2008-06-09
>
14 Council objective; Nuisance abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 1:00:40 PM
Creation date
6/5/2008 11:34:05 AM
Metadata
Fields
Template:
AGENDA
Item Number
14
AGENDA - Type
BIDS
Description
Demolition of a building at Casa Bonita
AGENDA - Date
6/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. File and obtain local and state demolition permits and notices. <br />2.3 Examinatior_ <br />A. CONTRACTOR shall survey the existing conditions prior to beginning on-site <br />demolition operations. <br />B. Verify that existing utilities to be removed have been disconnected and capped. <br />C. If unanticipated mechanical, electrical, or structural elements that conflict with the <br />intended function or design of the site are encountered, investigate and measure the <br />nature and extent of the conflict. <br />2.4 Utility Services <br />A. Maintain existing utilities in service and protect against damage during demolition <br />operations. <br />B. Schedule any utility outages with the Director of Community Development prior to <br />disconnection. <br />2.5 Protection <br />A. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of the <br />work area. Provision of safety includes use of appropriate barricades, traffic <br />control, control of the use of equipment near traffic or pedestrians, and provision of <br />other controls and warnings as needed or as specified herein. <br />B. CONTRACTOR shall continuously maintain adequate protection of all adjacent <br />construction against damage or loss from the operations performed under this <br />section. CONTRACTOR shall make good any such damage, injury, or loss, <br />except such as may be directly due to the actions of the CITY or its agents or due to <br />causes beyond CONTRACTOR's control and not to his fault or negligence. <br />C. All demolition that involves the removal or disturbance of asbestos containing <br />materials shall be performed in accordance with all applicable State and Federal <br />codes and regulations. <br />D. Equipment and tools left on the property are the responsibility of CONTRACTOR. <br />CITY shall not be responsible for theft, damage, or adverse use of the equipment. <br />2.6 Sequencing/Scheduling <br />A. CONTRACTOR shall work with the CITY and the Director of Community <br />Development to sequence and schedule work as necessary to obtain substantial <br />completion in accordance with the project schedule. <br />21 <br />. 000130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.