Laserfiche WebLink
<br />documents. <br /> <br />2.3.5 Furnish one copy of the above documents and of the Drawings and Specifications and <br />present and review them with OWNER. <br /> <br />2.4 Biddinlt <br /> <br />2.4.1 Assist OWNER in advertising for bids for a single prime contract for the Work. <br /> <br />2.4.2 Prepare addenda as appropriate to interpret, clarify or expand the Bidding Documents. <br /> <br />2.4.3 Attend the bid opening, prepare bid tabulation sheets, and recommend an award if deemed <br />appropriate. <br /> <br />2.5 Construction Phase <br /> <br />2.5.1 ENGINEER shall consult, advise, and act as OWNER'S representative as provided in the <br />construction contract. All of OWNER'S instructions to CONTRACTOR will be issued <br />through ENGINEER who will have authority to act on behalf of OWNER to the extent <br />provided in said construction contract. <br /> <br />2.5.2 In connection with observations of the work of CONTRACTOR while it is in progress: <br /> <br />2.5.2.1 ENGINEER shall make visits to the site at intervals ENGINEER deems necessary, in <br />order to observe the progress and quality of the CONTRACTOR'S work. Based on <br />information obtained during such visits and on such observations, ENGINEER shall <br />endeavor to determine in general, if such work is proceeding in accordance with the <br />contract documents. <br /> <br />2.5.2.2 If requested by OWNER or recommended by ENGINEER and agreed to in writing by <br />OWNER, an on-site observer will be furnished, to act as directed by ENGINEER in order <br />to assist ENGINEER in observing performance of the work. Such services will be paid <br />for as per Section 3b. The duties and responsibilities and the limitations on the authority <br />of the on-site observer will be set forth in a separate exhibit which is to be made a part of <br />this Agreement before such services begin. <br /> <br />2.5.2.3 ENGINEER'S visits to, and representation by the on-site observer at the site, will enable <br />ENGINEER to better carry out the duties and responsibilities assigned to ENGINEER <br />during the Construction Phase, and, by exercise of ENGINEER'S efforts as an experienced <br />and qualified design professional, provide OWNER a greater degree of confidence that <br />the completed work of CONTRACTOR will conform generally to the contract documents. <br />ENGINEER shall not, however, during such visits or as a result of such observations, <br />supervise, direct or have control over CONTRACTOR'S work, nor shall ENGINEER <br /> <br />Page 7 of 10 <br />