Laserfiche WebLink
ATTACHMENT A <br />ATMOS ENERGY CORPORATION <br />MID-TEX DIVISION <br />REVISION NO: 0 <br />RIDER: <br />GCR - GAS COST RECOVERY <br />APPLICABLE TO: <br />Entire Division <br />EFFECTIVE DATE: <br />10/01I2008 <br />PAGE: 42 <br />S= Estimated Mcf or MMBtu for the rate class for the current billing month. <br />The PCF is calculated to the nearest 0.0001 cent. <br />The Pipeline Cost to be billed is determined by multiplying the Mcf or MMBtu used by the appropriate <br />PCF. The Pipeline Cost is determined to the nearest whole cent. <br />Issued By: David J. Park Vice President, Rates and Regulatory Affairs <br />Date Issued: 08/13/2008 <br />.1 000057 <br />