Laserfiche WebLink
Trail de Paris <br />East Extension Project Contributors <br />• 0.8 mile asphalt trail extension <br />Grant-TPW D---------------------------------------------------$99,990.65 <br />• Prefab truss bridge, abutments and approach <br />Grant-First Federal Community fund---------------------- $30,000 <br />Grant-Greater Paris Development Foundation---------- $30,000 <br />Grant-Lennox Foundation----------------------------------- $30,000 <br />• Engineering cost estimates for trail construction <br />Hayter Engineering--------------------------------- PRO BONO <br />• Bridge approach design and bid package preparation <br />Hayter Engineering--------------------------------- PRO BONO <br />• Bridge abutments design <br />Clottey Engineering-------------------------------- PRO BONO <br />• Bridge abutment and approach construction <br />Stephen's and sons--------------------------------- AT COST <br />• Off loading of Prefab bridge <br />Stephen's and Sons--------------------------------- PRO BONO <br />• Setting Prefab Bridge <br />Hargis Electric --------------------------------------PRO BONO- SETTING COST <br />using Luckett Crane Service (Possibility if timing can be worked out) <br />• 2 sets of RR Bridge hand railings <br />Turner Pipe-tubing material-------------------- PRO BONO <br />Cunningham-angle iron material-------------- AT COST <br />Grant-PEDC- material cost--------------------------------- $700.00 <br />PJC welding department fabrication----------- PRO BONO <br />~ 000135 <br />