My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
08 August
>
2008-08-25
>
18 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 10:22:26 AM
Creation date
8/21/2008 4:51:22 PM
Metadata
Fields
Template:
AGENDA
Item Number
18
AGENDA - Type
MISCELLANEOUS
Description
Motion to award contract ot Richard Drake Construction Co. in the amount of $110,962.44 for the ext.
AGENDA - Date
8/25/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail de Paris <br />East Extension Project Contributors <br />• 0.8 mile asphalt trail extension <br />Grant-TPW D---------------------------------------------------$99,990.65 <br />• Prefab truss bridge, abutments and approach <br />Grant-First Federal Community fund---------------------- $30,000 <br />Grant-Greater Paris Development Foundation---------- $30,000 <br />Grant-Lennox Foundation----------------------------------- $30,000 <br />• Engineering cost estimates for trail construction <br />Hayter Engineering--------------------------------- PRO BONO <br />• Bridge approach design and bid package preparation <br />Hayter Engineering--------------------------------- PRO BONO <br />• Bridge abutments design <br />Clottey Engineering-------------------------------- PRO BONO <br />• Bridge abutment and approach construction <br />Stephen's and sons--------------------------------- AT COST <br />• Off loading of Prefab bridge <br />Stephen's and Sons--------------------------------- PRO BONO <br />• Setting Prefab Bridge <br />Hargis Electric --------------------------------------PRO BONO- SETTING COST <br />using Luckett Crane Service (Possibility if timing can be worked out) <br />• 2 sets of RR Bridge hand railings <br />Turner Pipe-tubing material-------------------- PRO BONO <br />Cunningham-angle iron material-------------- AT COST <br />Grant-PEDC- material cost--------------------------------- $700.00 <br />PJC welding department fabrication----------- PRO BONO <br />~ 000135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.