My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
08 August
>
2008-08-25
>
18 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 10:22:26 AM
Creation date
8/21/2008 4:51:22 PM
Metadata
Fields
Template:
AGENDA
Item Number
18
AGENDA - Type
MISCELLANEOUS
Description
Motion to award contract ot Richard Drake Construction Co. in the amount of $110,962.44 for the ext.
AGENDA - Date
8/25/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ At the unit prices shown on the Unit Price Bid Schedule included in the Contract <br />Documents. Article 5. PAYMENT PROCEDURES <br />CONTRACTOR shall submit Applications for Payment in accordance with the General <br />Conditions. Applications for Payment will be processed by ENGINEER, as provided in the <br />General Conditions. <br />The OWNER shall retain 10% of the amount of each payment until final completion and <br />acceptance of all Work covered 'by the Contract Documents. When the Work is substantially <br />complete, the retained amount may be reduced to 5%, at the OWNER'S discretion. <br />Article 6. INTEREST <br />If the contract amount of this contract is less tllan $400,000, no interest will be paid to the <br />~ <br />, <br />CONTRACTOR on retained money. When the contract amount exceeds $400,000, no interest <br />~ will be paid unless required by law. <br />Article 7. CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />~ <br />~ representations: <br />7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract <br />Documents, Work, site, locality, and all local conditions and Laws and Regulations that, <br />~ in any manner, may affect cost, progress, performance or furnishing of the Work. <br />7.2 CONTRACTOR has studied carefuliy all reports of explorations and tests of subsurFace <br />~ conditions and drawings of physical conditions, if any, which are contained or identified <br />in the Contract Documents, and accepts the determination set forth in the Contract <br />Documents of the extent of the tecllnical data contained in such reports and drawings <br />~ upon which CONTRACTOR is entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />~ obtaining and carefully studying) all such examinations, investigations, explorations, <br />tests, reports and studies in addition to, or to 'supplement, those referred to above, which <br />pertain to the subsurface or physical cotiditions at or contiguous to the site, or otherwise <br />~ may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR <br />considers necessary for the performance or furnishing of the Work at the Contract Price, <br />~ within the Contract Time and in accordance with the other terms and conditions of the <br />Contract Documents, and no additional examinations, investigations, explorations, tests, <br />reports, studies or similar information or data are, or will be, required by <br />~ CONTRACTOR for such purposes. <br />~ <br />19 <br />n o o i 2. 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.