My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-068-RES Approving the bid and awarding the contract for the Trail De Paris 0.8 mile easter trail extension project to Richard Drake Construction Company, L.P.
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2008
>
2008-068-RES Approving the bid and awarding the contract for the Trail De Paris 0.8 mile easter trail extension project to Richard Drake Construction Company, L.P.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 1:03:06 PM
Creation date
9/8/2008 9:36:50 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2008-068-RES
Doc Type
Resolution
CITY CLERK - Date
8/25/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. BIDDER will complete the Work for the following price(s): <br />UNIT PRICE SCHEDULE <br />ESTIMATED UNIT TOTAL <br />NO. DESCRIPTION QUANTITY PRICE PRICE <br />l. 4" Crushed aggregate base <br />(installation only). 6,571 SY $ $;2 7, S Q g-W <br />2. 2" Hot-mixed asphalt wearing surface. 6,632 SY $ 15 $ 83•N, q•a`t' <br />TOTAL BASE BID: 4 1VUA4,e, "ed $/L~~4q <br />WORDS) f R~~ (FIGURES) <br />5. BIDDER agrees t at the Work will be substantially ompleted and ready for final <br />payment within 60 calendar days from receipt of Notice to Proceed from the City of <br />Paris, as provided in the General Conditions. <br />BIDDER accepts the provisions of the Agreement as to $100 per calendar day liquidated <br />damages in the event of failure to complete the Work on time. <br />6. The following documents are attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of EO% b_t,,4 `JorL~ <br />7. Communications concerning this Bid shall be addressed to the address of BIDDER <br />indicated below. <br />8. The terms in this Bid, which are defined in the General Conditions of the Construction <br />Contract, included as part of the Contract Documents have the meanings assigned to them <br />in the General Conditions. <br />SUBMITTED on (lu Cl 1,k / 200-• <br />~ <br />Of the above total - Base Bid, $ 3c) is for materials actually <br />incorporated in the Work, and $ 1 c~ is for all other costs. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.