Laserfiche WebLink
BIDDER has not directly or indirectly induced or solici ted any other BIDDER to <br />submit a false or sham Bid; BIDDER has not solicited or induced any person, firm, <br />or corporation to refrain from bidding; and BIDDER has not sought by collusion to <br />obtain for itself any advantage over any other Bidder or over CITY. <br />4. BIDDER will complete the Work for the following price: <br />Description of work: Demolition and disposal of eighteen (18) structures at the <br />Casa Bonita Apartment Complex. Bidders should carefully <br />review the Master Specifications included in the Contract <br />Documents to ensure the Bid includes al] potential aspects of <br />property removal and disposal. ;,v ITN SWPPP. <br />Additional instructions: The required method of demolitio:l includes wetting of the <br />debris. The City of Paris will allow the successful Bidder <br />to connect to fire hydrants at the site to obtain water for this <br />purpose; however, Bidders should include in their bid the <br />cost of labor and equipment for connecting to water sources <br />and wetting the debris during demolition. <br />t Total Bid <br />$ :3`dm, 6,570,cs7 <br />CONCRETE REMOVAL: After demolition of the remainin;; buildings, there will be <br />numerous building slabs (approximately 29) and parking lots anii associated driveways on <br />the property. All bidders should additionally bid the cost of bre,iking up and removing all <br />slabs, parking lots, and driveways from the property. The Cit}, reserves the right to not <br />have this portion of the woi-k performed. <br />Total additional cost to break up and remove concrete slabs <br />Total additional cost to break up and remove parking lots <br />and driveways $ 37, 31 O, <br />ABATEMENT: There are eurrently four buildings located on th.-I comer of 7~' Street N.W. <br />and Henderson adjacent to the Casa Bonita Apartment Comple): that are privately owned <br />but are under code enforcement action. All bidders should additionally bid the cost of <br />demolishing and disposing of those structures in accordance with the same requirements as <br />the buildings which aze a part of the Casa Bonita Complex. The cost should include <br />wetting the debris as stated above. <br />Total cost to remove 4 additional buildings <br />$ to~►~ZZ,vo <br />Tota] additional cost to break up and remove 5 concrete slabs $ 12 , Oo L4 .1O <br />~ L)Pou lZg6z,)Ee,-r D&ajc.-rs vF Pta4-r1C wJ2dp oF TrzAci C25 <br />t~ D~ o ~~T o F rJo 4-' 2~ Q , r~~ S~Ta-r E ALJ iD r-r_L->~.aLA L Ai rz MoOt TV►z, /,X- <br />G4u 3~ P2-~c~~. 10 <br />a Q0p17'7 <br />y _ - r _ _ <br />