Laserfiche WebLink
EXHIBIT B- PROJECT HISTORY AND CONTACTS <br />Name: Mr. Bruce Heller <br />Telephone Number: 214-495-8581 E-Mail: bruceheller@jaryco.com <br />Address: 1333 W. McDermott, Suite 150 <br />Allen, TX 75013 <br />Name and Location of Project: Mall Del Norte <br />Laredo, Texas <br />Contract Amount: $1,400,000 <br />Percent Complete: 100% <br />Project Completion Date: September 2007 <br />Description of Project: This was a mall remodel done at night which included floor tile, <br />ceiling, and mall entrance demolition. <br />Name: Mr. Josh Randall <br />EMJ Corporation <br />Telephone Number: 423-855-1550 <br />Address: 2030 Hamiltion Place Blvd. <br />Suite 200 <br />Chattanooga, TN 37421 <br />Name and Location of Project: Demolition of 9 Houses <br />SMU Dallas Campus <br />Contract Amount: $60,000 <br />Percent Complete: 100% <br />Project Completion Date: April 2007 <br />Description of Project: Demolition of 9 houses throughout SMU Dallas Campus. <br />Owner Reference Contact with address and phone number: <br />Name: Mr. Ron Russell <br />Telephone Number: 214-768-3296 <br />Address: PO Box 750273 <br />Dallas, TX 75275 <br />Name and Location of Project: <br />Professional Tower Demolition <br />Ector County Hospital District <br />Odessa, Texas <br />Contract Amount: $484,000 <br />Percent Complete: 100% <br />Project Completion Date: August 2006 <br />Description of Project: Demolition of 10 story concrete building, approx. 95,000 sq. ft., <br />with demo, backfill, and compaction of basement. This job was adjacent to 2 streets that were <br />protected during demolition. <br />Owner Reference Contact with address and phone number: <br />Name: Mr. John Durham <br />Telephone Number: 432-640-4678 <br />E-Mail: jdurham@echd.org <br />2 <br />~ 000187 <br />