My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2008
>
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 1:04:11 PM
Creation date
10/2/2008 3:14:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2008-078-RES
Doc Type
Resolution
CITY CLERK - Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~yC~E~F3r i ~ <br />eEmoIITion <br />CoN RUCTION' R_esuitle Mr. Jose Villarreal <br />COMPANY, INC. <br />Mr. Villarreal first came to work for Intercon Construction Co. <br />in Janu:iry 2007 as a Assistant Superintendant on our Mall De <br />Norte F'roject in Laredo, Tegas. There he ezhibited great <br />Leader,ship and Management Skills in helping to Supervise a <br />workfo r-ce of 30 people during an S month long night project. <br />This wiis a selective demolition project that required his <br />managE:ment of creating schedules, selecting proper sub crews, <br />deciding on means and methods almost on a nightly basis to <br />maintai.m project schedule. All this was done with knowledge of <br />reading; drawings and in some cases interpreting drawings <br />based o» his understanding of construction goals from jobsite <br />meetin€;s and at the same time staying up to date wit6 changes <br />in t6e work. At the end of the job t6e General Contractor said <br />that Intercon and Mr. Villarreal was the pusher on the job and <br />was the main reason the whole project was done on time. <br />~ <br />At the e::nd of MaII De Norte Mr. Villarreal came to Dallas to <br />Supervi:;se a 1,000,000 sq. ft. apartmeat demoliNon project. This <br />project :had a workforce of 25 people, 4 excavators, 3 backhoe's, <br />haul trricks and our concrete crushing operation. Also while <br />managiug this workforce he interacted with owners at <br />meeting;s, met and spearheaded walkthrough meetings with <br />City Inspectors, SWPPP inspectors and TDH officials. He <br />coordinated all utility locates and managed demolition around <br />them. <br />Mr. Villlarreal is a great asset to Intercon Construction and will <br />successi'ully complete any job he is on. <br />WORK I=[ISTORY <br />• V:aquillas Construction 2002 - 2006 Superintendant <br />• Te,xas Region Contractors 2000 - 2002 Ass't Superintendant <br />• Cllack Corporafiun 1997 - 2000 Ass't Supervisor <br />• O scar Meyer 1993 -1997 Line Leader <br />301 W. Avenue D <br />Garland, 7exas 76040 EDUCA'1CION <br />hone (972) 424-2220 .Riio High Schoot, Rfo Wisconsin <br />=ax (972) 424-0812 <br />" Mabile (972) 670-6166 <br />EmaiL• <br />teeritdowndemogaol.com ~ 000191 <br />' T <br />
The URL can be used to link to this page
Your browser does not support the video tag.