Laserfiche WebLink
4g. Strategic Plan Maps <br />The Strategic Plan will also include a series of maps and graphics covering: <br />• Existing Land Use <br />• Preferred Land Use Scenario <br />• Road Classification System <br />- Water Utility Plan <br />• Wastewater Utility Plan <br />Task 4 Products <br />Consensus Planning will prepare a technical memorandum summarizing the comments received and our <br />suggested changes to the Strategic Plan; and 20 copies of the administrative draft Strategic Plan for distribution. <br />TASK 5: PUBLIC DRAFT (MAY - JUNE 2009) <br />This task will involve the preparation of the public draft Strategic Plan based upon the comments received under <br />Task 4 from the City, PEDC, and the Steering Committee, and presenting the draft to the public for comment. <br />5a. Public Draft Strategic Plan <br />Consensus Planning will prepare the public draft Strategic Plan based on comments received under the <br />previous task. Twenty copies of the Strategic Plan (formatted fo be compatib/e with Microsoft 2007) will be <br />provided, along with a PDF version which can be put onto the City's web site, and therefore, be more <br />accessible to the public for review. Consensus Planning's contact information should be provided on the web <br />site, along with an area provided for comments. <br />5b. Steering Committee Meeting #4 <br />The fourth Steering Committee meeting will be a presentation of the public draft Strategic Plan. Comments from <br />the Committee will be gathered and added to the comment matrix described later in this section. <br />5c. Public Meeting #3 <br />The third public meeting will be a presentation of the Strategic Plan. Comments from the community will be <br />gathered and added to the comment matrix. <br />5d. Plan Comment Matrix <br />A comment matrix will be created that will document all of the comments received and the response to each of <br />the comments. The comment matrix will become a part of the permanent record of the public involvement <br />process for the Strategic Plan. <br />Task 5 Products and Meetings <br />Consensus Planning will provide a matrix of comments and responses; 20 copies of the public draft Strategic Plan; <br />a PDF version on CD; and will hold the fourth Steering Committee meeting and the third public meeting. <br />TASK 6: FINAL STRATEGIC PLAN (JULY - AUGUST 2009) <br />-6- <br />m UOQ32~ <br />. . . . , . T. . ._T_ . . . .,r_.._...y......~.T. <br />