My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 Approve a resolution to enter into a contract with Hayter Engineering, Inc. to provide engineering services for our ORCA, TxCDBG, project for water line replacement
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
11 November
>
2008-11-24
>
11 Approve a resolution to enter into a contract with Hayter Engineering, Inc. to provide engineering services for our ORCA, TxCDBG, project for water line replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 9:40:35 AM
Creation date
11/21/2008 4:49:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
11
AGENDA - Type
MISCELLANEOUS
Description
Professional Service Contract
AGENDA - Date
11/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.16 Bear all costs incident to compliance with the requirements of this Section 3. <br />SECTION 4- PERIOD OF SERVICE <br />4.1 The provisions of this Section 4 and the various rates of compensation for ENGINEER' S <br />services provided for elsewhere in this Agreement have been agreed to in anticipation of <br />the orderly and continuous progress of the Project through completion of the Construction <br />Phase. <br />4.2 ENGINEER' S services under the Final Design Phase shall be considered complete at the <br />earlier of (1) the date when the submissions for that phase have been accepted by <br />OWNER or (2) thirty days after the date when such submissions are delivered to OWNER <br />for final acceptance, plus such additional time as may be considered reasonable for <br />obtaining approval of governmental authorities having jurisdiction over design criteria <br />applicable to the Project. <br />4.3 After acceptance by OWNER of the ENGINEER' S Drawings, Specifications and other <br />Final Design Phase documentation, ENGINEER shall proceed with performance of the <br />services called for in the Bidding Phase. This Phase shall terminate and the services to be <br />rendered hereunder shall be considered complete upon commencement of the <br />Construction Phase or upon cessation of the negotiations with prospective <br />CONTRACTOR(S). <br />4.4 Basic services during the construction period are understood to be for the time of <br />completion initially specified in the corresponding construction contract, and services <br />beyond that time, including services as expert witness or assisting in litigation, or services <br />due to failure of the CONTRACTOR to complete on time, will be deemed additional <br />services. <br />SECTION 5- PAYMENTS TO ENGINEER <br />5.1 Methods of Payment for Services and Expenses of ENGINEER. <br />5.1.1 For Basic Services: <br />OWNER shall pay ENGINEER for Basic Services in certain of the phases, as follows: <br />Additional Services - OWNER shall pay ENGINEER for additional services rendered under this : <br />5.1.2.1 General - For Additional Services rendered, on the basis of per diem hourly rates shown <br />on Exhibit A hereto for services rendered by principals and employees assigned to the <br />Project. Additional Services which are known to be required at this time <br />include <br />10 <br />~ UUUOO:J <br />
The URL can be used to link to this page
Your browser does not support the video tag.