My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Capital Improvement Plan
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2008
>
12 December
>
2008-12-08
>
09 Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 9:17:55 AM
Creation date
12/5/2008 3:11:54 PM
Metadata
Fields
Template:
AGENDA
Item Number
09
AGENDA - Type
MISCELLANEOUS
Description
Capital Improvement Plan
AGENDA - Date
12/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTY COUNCIL AGENDA ITEM BRIEFING SHEET <br />Submittal Date: <br />Originating Departrnent: <br />Presented By: <br />Agenda Item No.: <br />11/26/08 <br />Shawn Napier, P.E. City Engineer <br />Council Date: <br />Engineering 41 <br />/Director of Public Works <br />9, <br />12/08/08 <br />RECOMMENDED MOTION: <br />Not an action item - Presentation <br />POLICY ISSUE(S): <br />Capital Improvement Plan <br />BACKGROUND: <br />As part of the City Council's goals and objectives was a 10-year capital improvement plan. This plan <br />consists of water, sewer and street projects that have been prioritized by the Engineering, Water <br />Distribution, Sewer Maintenance and Street Departments. The projects listed are for current problem <br />areas. These areas change over time and the list will be reprioritized as problems with the systems arise <br />during the next months and years. The number of projects done each year will depend on how much <br />money is budgeted each year. The City will make the final payment on three different bonds issues in <br />the 2011-20 ] 2 budget year, which means we will have an additional $2,221,211 so spend in the 2012- <br />2013 budget year. The street replacement list includes the basic items in the Street deparhnent budget <br />for preventative maintenance. The preventative maintenance performed on streets consists of crack <br />sealing and seal coating. As water and sewer line replacement projects are completed, the streets will be <br />evaluated as to the best long term application. The street could be completely rehabilitated, overlaid <br />with asphalt, overlaid with a plant mix seal or seal coated. The street replacement list will lag behind <br />the water and sewer replacement list in order to allow time for compaction of the trenches where the <br />new water and sewer lines have been placed. Two new items appear on the preventative maintenance <br />section of the street replacement plan; they are Plant mix seal and concrete repair. Plant mix seal is an <br />asphalt material that is applied to a street about 3/ of an inch think. It provides an intermediate step <br />between seal coat and asphalt overlay which usually involves milling about two inches of material off <br />the surface of the roadway and then applying two new inches of asphalt. Concrete repair will be needed <br />because of all the concrete streets that have been constructed and are in need of repair. <br />BOARD/CAMMISSION RECOMMENDATION: <br />N/A <br />EXHIBITS: <br />Project list for water, sewer, streets and a totals page. <br />ACTION: <br />BUDGET INFO: <br />❑ Financial Report ❑ Minute Onder <br />Expense <br />$Varies by project and year <br />❑ Departrnent Report ❑ Resolution <br />Budgeted Amt <br />$ Varies by year see chart attached <br />Z <br />Presentation ❑ <br />Ordinance <br />y'1rD Actual <br />$ <br />❑ <br />Public Hearing ❑ <br />Other <br />Acct Name <br />Acct Number <br />FISCAL NOTES: <br />REVIEWED AND APPROVED BY: <br />Z Administration Z City C1erk ❑ Community Development ❑ EMS/IT ❑ Finance ❑ Fire <br />❑ Municipal Coutt ❑ Legal ❑ Libraxy ❑ Police E Eng./Public Works ❑ Utilities <br />City of Paris <br />Revised 2J04/08 <br />0 UOU01~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.