Laserfiche WebLink
G. CONTRACTOR shall use equipment that is suitable for the work to be performed and the <br />time constraints of the bid. <br />1.04 LEVELING, FILLING, AND GENERAL BLADE WORK <br />A. Work Orders will, at times, require that lots be leveled, abandoned wells filled, holes filled, <br />or humps brought to normal grade. Blade work may be necessary to improve drainage, <br />remove humps, fill holes, or other needs. This type of work may require the use of <br />heavy equipment, standard box blades, angled blades, or tiller type attachments. Fill dirt <br />required may provided by OWNER if necessary. <br />l. Blade work shall be carefully performed to a level approved by OWNER. This <br />includes leveling of the area designated and removing ruts, holes, low spots, roots, <br />debris, large clumps of soil, rocks, and any other material that interferes with the <br />maintenance of the property. <br />2. Wells shall be filled with clean sand or gravel type material. No exceptions. <br />CONTRACTOR must advise OWNER prior to filling a well if additional expenses <br />will be incurred. <br />1.05 FENCES <br />A. Removal of residential fences may only be provided when specified by the OWNER. <br />B. Removal of residential fences shall include the removal of all posts, concrete, sheet metal, <br />wire, brush, junk, etc. and may include work by hand or equipment when allowable. <br />When a fence is removed, the material removed is rubbish and shall be disposed of by <br />CONTRACTOR; however, brick or concrete may be buried on site. <br />1.06 DISPOSAL AND RECYCLING <br />A. Bricks and concrete may be buried on site at CONTRACTOR=s option; however, all other <br />waste shall be deposited in a TCEQ approved landfill with receipts provided to the City of <br />Paris. <br />B. Contractors shall furnish written proof to the OWNER of the proper and legal disposal at <br />local TCEQ approved landfill operated by Waste Management of all materials generated <br />from performance of the Agreement. Final payment will not be released to <br />CONTRACTOR until proof of proper disposal of all items has been furnished to OWNER <br />and OWNER has confirmed that all items listed on the Work Order have been satisfactorily <br />completed. <br />1.07 UTILITIES <br />Unless otherwise specified, utility disconnects shall be the responsibility of OWNER. <br />24 <br />m 0OU10J <br />