Laserfiche WebLink
<br />Tariff for Gas Service <br /> <br />TXU Gas Distribution <br /> <br />RATE SCHEDULE: Miacellaneoua Service Ch8rgea Nos. 9001 thru 9007 <br />APPLICABLE TO: Aa Referenced REVISION: 0 <br />EFFECTIVE DATE: Aa Referenced PAGE: 2 OF 2 <br /> <br />9006 Charge for Inatalllng and Maintaining <br />and Excess Flow Valve <br /> <br />(Reaidential) <br /> <br />A customer may request the Installation of an excess flow valve on a new service line or on a <br />service line being replaced provided that the service line will serve a single residence and operate <br />continuously throughout the year at a pressure of not less than 10 psig. The customer will pay the <br />actual cost incurred to install the excess flow valve. That cost will include the cost of the excess <br />flow valve, the labor cost required to install the excess flow valve, and other associated costs. The <br />estimated total cost to Install an excess flow valve is $50.00. This cost is based on installing the <br />excess fiow valve at the same time a service line is installed or replaced. The excess flow valve <br />will be installed on the service line upstream of the customer's meter and as near as practical to <br />the main. <br /> <br />A customer requiring maintenance, repair, or replacement of an excess flow valve will be required <br />to pay the actual cost of locating and repairing or replacing the excess flow valve. The cost to <br />perform this service will normally range from $200.00 to $2,000.00, depending on the amount of <br />work required. This cost will be determined on an individual project basis. <br /> <br />This tariff is being filed in accordance with the U.S. Department of Transportation rule requiring <br />the installalion of an excess flow valve, if requested by a customer, on new or replaced service <br />lines that operate continuously throughout the year at a pressure of not less than 10 psig and that <br />serve a single residence. The rule further states that the customer will bear all costs of installing <br />and maintaining the excess flow valve. <br /> <br />9007 Recovery of Connection Costs Aasoclated <br />with Certain Stand-By Gas Generators <br /> <br />(Commercial) <br /> <br />Commercial cuslomers installing stand-by gas generators to provide service in the event of an <br />interruption in electric service In facilities where gas service is not otherwise provided will <br />reimburse TXU Gas Distribution for the actual cosl of acquiring and installing the regulator, <br />service line, and meter required to provide gas service for the stand-by generators. Gas service <br />provided for the stand-by generators will be billed at the applicable commercial rate. <br />