My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-067-RES ACCEPTING GRANT AWARD FROM TXDOT ETAL FOR AIRPORT DEVELOPMENT PROJECT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2001
>
2001-067-RES ACCEPTING GRANT AWARD FROM TXDOT ETAL FOR AIRPORT DEVELOPMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:05 PM
Creation date
8/7/2001 8:46:27 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2001
Doc Type
Resolution
CITY CLERK - Date
5/14/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and construction of this project within two years of completion of design services. The <br />Sponsor agrees to complete and construct this project within two years of completion of <br />design services, subject to the availability of federal funds. <br /> <br />PART ill - Sponsor Responsibilities <br /> <br />1. In accepting the Agreement, the Sponsor guarantees that: <br /> <br />. _'" i. <br /> <br />a. it will comply with the Attachment A, Certification of Airport Fund, attached and <br />made a part of this Agreement; and <br /> <br />b. it will comply with the Attachment B, Airport Assurances (9/99)(State Modified <br />9199), attached and made a part ofthis Agreement; and <br /> <br />c. it will comply with the Attachment C, Pavement Maintenance Management <br />Program, attached and made a part ofthis Agreement; and <br /> <br />d. <br /> <br />it will, in the operation of the facility, comply with all applicable state and federal <br />laws, rules, regulations, procedures, covenants and assurances required by the <br />State of Texas or the FAA in connection with the federal grant; and <br /> <br />e. <br /> <br />the Airport or navigational facility which is the subject of this Agreement shall be <br />controlled for a period of at least 20 years, 'and improvements made or acquired <br />under this project shall be operated, repaired and maintained in a safe and <br />serviceable manner for the useful life of the improvements, not to exceed 20 years; <br />and <br /> <br />f <br /> <br />consistent with safety and security requirements, it shall make the airport or air <br />navigational facility available to all types, kinds and classes of aeronautical use <br />without unjust discrimination between such types, kinds and classes and shall <br />provide adequate public access during the term ofthis Agreement; and <br /> <br />g. <br /> <br />it shall not grant or permit anyone to exercise an exclusive right for the conduct of <br />aeronautical activity on or about an airport landing area. Aeronautical activities <br />include, but are not limited to scheduled airline flights, charter flights, flight <br />instruction, aircraft sales, rental and repair, sale of aviation petroleum products and <br />aerial applications. The landing area consists of runways or landing strips, <br />taxiways, parking aprons, roads, airport lighting and navigational aids; and <br /> <br />h. <br /> <br />it shall not permit non-aeronautical use of airport facilities, unless noted on an <br />approved Airport Layout Plan, without prior approval of the StateIF AA:, and <br /> <br />it shall not enter into any agreement nor permit any aircraft to gain direct ground <br />access to the Sponsor's airport from private property adjacent to or in the <br />immediate area of the airport. Further, Sponsor shall not allow aircraft direct <br />ground access to private property. Sponsor shall be subject to this prohibition, <br /> <br />Page 4 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.