My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-068-RES AWARDING BID/AUTHORIZING EXECUTION OF AGREEMENT FOR PREPARATION OF SITE WORK AROUND NEW 7 UNIT NESTED T-HANGAR AT COX FIELD AIRPORT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2001
>
2001-068-RES AWARDING BID/AUTHORIZING EXECUTION OF AGREEMENT FOR PREPARATION OF SITE WORK AROUND NEW 7 UNIT NESTED T-HANGAR AT COX FIELD AIRPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:05 PM
Creation date
8/7/2001 8:50:06 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2001
Doc Type
Resolution
CITY CLERK - Date
5/14/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT <br /> <br />THIS AGREEMENT is dated as of the 14th day of Mav <br />between City of Paris, Paris, Texas, (hereinafter called OWNER) and <br />(hereinafter called CONTRACTOR). <br /> <br />in the year 20Q..L by and <br />Richard Drake Construction <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br /> <br />PREPARATION OF SlTE WORK AROUND NEW 7 UNIT NESTED T-HANGAR <br /> <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br /> <br />PREPARATION OF SITE WORK AROUND NEW 7 UNIT NESTED T-HANGAR <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by City Engineer, City of Paris, Paris, Texas, or his authorized <br />representative, who is hereinafter call ENGINEER and who is to act as OWNER'S representative, <br />assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in <br />the Contract Documents in connection with completion of the Work in accordance with the Contract <br />Documents. <br /> <br />Article 3. CONTRACT TIME. <br /> <br />3.1 The Work will be substantially completed within ...l!ill- days from the date when the <br />Contract Time commences to run as provided in paragraph 2.3 of the General Conditions, <br />and completed and ready for final payment in accordance with paragraph 14.13 of General <br />Conditions within 210 days from the date when the Contract Time commences to run. <br /> <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the Work is not completed <br />within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in <br />accordance with Article 12 of the General Conditions. They also recognize the delays, <br />expense and difficulties involved in proving in a legal or arbitration proceeding the actual <br />loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of <br /> <br />18 <br /> <br />EXHIBIT A I <br />
The URL can be used to link to this page
Your browser does not support the video tag.