Laserfiche WebLink
<br />m <br />>< <br />J: <br />- <br />OJ <br />=i <br /> <br />co <br /> <br />Sesaco Corporation Phase I Life <br />CAPITAL IMPROVEMENTS 7 10 16 20 <br />SEED RECEIVING <br />Blower system to remove seed from tanks $20,000 $20,000 <br />Repair truck auger and tall elevator $7,000 $7,000 <br />SEED RECEIVING TOTAL $27,000 $27,000 $27,000 <br />DRY CLEANING <br />Titan screening machine $54,000 <br />Oliver gravity separator $35,000 $35,000 $35,000 <br />Blower system for dry cleaning $18,000 $9,000 $9,000 <br />Installation by Sesaco $5,000 <br />Batch weighing system $20,000 <br />TOTAL DRY CLEANING $132,000 $44,000 <br />EQUIP CHANGES DURING CONSTRUCTION <br />LMC and Oliver relocation by Sesaco $2,500 <br />Electrical (Material & Labor) $2,200 $2,200 <br />Blower system for temporary equipment $9,000 $9.000 <br />TOTAL FOR EQUIPMENT $13,700 $11,200 $11,200 <br />NEW BUILDING <br />Electrial equipment removal by Sesaco $2,000 $2,000 <br />Building demolition $10,000 $10,000 <br />Foundation work $28,000 $28,000 <br />Building construction cost(includes doors and air curtain $96,000 $96,000 <br />Sprinkler system (use existing valve system) $25,000 $25,000 <br />Gas & water piping $5,000 $5,000 <br />Electric (Material & labor for building and equipment wir $45,600 $45,600 <br />Hot water system relocation $3,500 $3,500 <br />Building permit $600 $600 <br />Drawing cost $2,500 $2,500 <br />Structural Eng. Cost $1,100 $1.100 <br />BUILDING TOTAL $219,300 $219,300 $219,300 <br />