My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-130-RES ACCEPT PROPOSAL OF HAYTER ENGINEERING FOR STILLHOUSE ROAD IMPROVEMENT PROJECT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-130-RES ACCEPT PROPOSAL OF HAYTER ENGINEERING FOR STILLHOUSE ROAD IMPROVEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:49 PM
Creation date
10/30/2002 2:16:56 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />L:J HAYTER <br />R ENGINEERING, INC. <br /> <br />4445 S.E. LOOP 286 <br />PARIS. TEXAS 75460 <br />(903) 785-0303 <br />FAX (903) 785-0308 <br /> <br />CONSULTANTS PLANNERS ENGINEERS <br /> <br />August 2, 2002 <br /> <br />Mr. Shawn Napier, P.E. <br />City Engineer <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75460 <br /> <br />Re: Proposal for Engineering Services <br />Stillhouse Road Improvements <br /> <br />Dear Shawn: <br /> <br />We appreciate your selection of our firm to provide a proposal for engineering services for the right- <br />of-way acquisition, design, and construction phases for the improvement of Stillhouse Road from <br />Clement Road to Loop 286. <br /> <br />Under previous contract we have completed an alignment study for this project. The project length is <br />about 2,000 feet, and the proposed right-of-way width would be 70 feet. Major reconstruction or <br />relocation of 2 box culverts will be required, along with storm sewer in some areas. Coordination <br />with TxDOT will be necessary at Loop 286, and with various utilities along the project route. 14 <br />parcels have been initially identified for acquisition. The proposed pavement section would be of <br />concrete, with curb and gutter, with the precise width yet to be determined. <br /> <br />We propose to provide the following services: <br /> <br />1. Right-of- Way Acquisition Phase- <br /> <br />a) Consult with City as required to define right-of-way needs. <br />b) Furnish a registered professional surveyor and supporting staff to provide on the <br />ground surveys and prepare field notes for each acquisition (14 estimated). <br />c) Set monumentation for easements. <br /> <br />2. Design Surveys Phase - <br /> <br />a) During the alignment study, aerial topography was obtained. The design surveys <br />phase would include limited topographic surveying necessary to obtain culvert <br />flowlines, sewer depths, and similar data to supplement the aerial photography. <br /> <br />EXHIBIT .A <br />
The URL can be used to link to this page
Your browser does not support the video tag.