My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-081-RES ACCEPT PROPOSAL OF FREESE & NICHOLS FOR PROFESSIONAL ENGINEERING SERVICES FOR PRODUCTION STUDY OF WATER TREATMENT OF COP
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-081-RES ACCEPT PROPOSAL OF FREESE & NICHOLS FOR PROFESSIONAL ENGINEERING SERVICES FOR PRODUCTION STUDY OF WATER TREATMENT OF COP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:43 PM
Creation date
6/4/2002 9:02:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Water Treatment Plant Production <br /> <br /> <br />-~--- <br /> <br />WATER TREATMENf PLANT ASSESSMENT <br />The treatment plant production evaluation will include an assessment of the different <br />treatment processes including the plant's rapid mix basins, the flocculation / <br />sedimentation basins, chemical feed addition and disinfection as well as filtration and <br />treated water storage. In addition, raw and treated water pumping capacities and <br />sludge production rates and sludge disposal will also be assessed. Our experience in <br />evaluation and design of different types of filters (air scour, Aries, underdrains, filter <br />media etc.) and filter renovations <br />allows us to present alternatives <br />in a format that facilitates <br />informed decisions to best meet <br />the needs of the City. In the past <br />10 years, our team has designed <br />more than 50 filters (new or <br />renovated) to treat over 250 <br />MGD at 12 different water <br />treatment plants in Texas. A <br />listing of recent filter projects in <br />included in the Appendix.. <br /> <br />_____.:::::~.::::....-6 .-c, ______~ <br /> <br />.... <br /> <br />We will also assess immediate <br />and long-term requirements for <br />compliance with various <br />provisions of the Safe Drinking Water Act and make recommendations for optimizing <br />the production capacity of the plant. Our strong working relationship with the Texas <br />Natural Resource Conservation Commission (TNRCC) and other regulatory agencies <br />coupled with a good understanding of the regulations will help the City in its efforts <br />to ensure that it is meeting current and future applicable regulations. Freese and <br />Nichols has recently completed SDWA Evaluations for more than 12 water treatment <br />plants in Texas. <br /> <br />CONSTRUCTABILIlY & COST ESTIMATING <br />Cost estimating is essential to help make sound decisions for the City. Freese and <br />Nichols employs a large group of full-time construction professionals dedicated to the <br />construction of water and wastewater treatment facilities in Texas. These <br /> <br /> <br />i.'iIIC) /(!fi\',.-) <br />
The URL can be used to link to this page
Your browser does not support the video tag.