Laserfiche WebLink
<br />Water Treatment Plant ProcJuction <br /> <br />---- <br />" .... L ...... <br />--------------_._~ <br /> <br />grit/sludge handling facilities, basins, clarifiers, blower building, <br />office/warehouse building, numerous types and sizes of piping and <br />renovation/expansion of the existing laboratory, administration, maintenance <br />and electronics buildings. <br /> <br />City of Brownwood, Texas - Construction manager for wastewater treatment <br />plant renovations. The project involved expansion and renovation of the <br />existing treatment plant to increase the capacity from 3.6 to 4.5 mgd and the <br />rehabilitation of the collection system by sliplining over 55,000 linear feet of <br />existing clay tile sewer pipe, ranging in size from 6-inch to 30-inch. The <br />improvements increased the capacity of the facilities from 3.6 to 4.5 mgd. <br /> <br />. <br /> <br />Construction manager for seven <br />systems for O.H. Ivie Pipeline <br /> <br />. Colorado River Municipal Water District- <br />new pump stations with power and telemetry <br />improvements. <br /> <br />City of Stephenville, Texas - Construction manager for wastewater treatm <br />plant expansion improvements. The project involved expansion and <br />renovation of the existing treatment plant to increase the capacity from 1.9 to <br />3.0 mgd. <br /> <br />ent <br /> <br />. <br /> <br />. City of Breckenridge, Texas - Construction manager for extensive <br />improvements to the wastewater treatment plant. The project involved <br />expansion and renovation of the existing treatment plant to increase the <br />capacity from 0.75 to 0.95 mgd. <br /> <br />. City of Mineral Wells, Texas - Construction manager for Willow Creek <br />Wastewater Treatment Plant improvements. The project involved expansion <br />and renovation of the existing treatment plant to allow it to meet EPA <br />mandated discharge requirements. <br /> <br />Brown County Water Improvement District No. 1- Construction manager for <br />construction of 4,000 linear feet of new 30-inch treated water pipeline at the <br />water treatment plant. In addition, construction of a 1 million gallon ground <br />storage tank to replace the two existing tanks that are no longer serviceable <br />due to structural damage <br /> <br />. <br /> <br />2 <br />1 <br /> <br />YEARS OF EXPERIENCE <br /> <br />With FNI <br />With Other Firms <br /> <br />EDUCATION <br />ME, Civil Engineering <br />University of Texas-Arlington <br />BS, Civil Engineering <br />University of Texas-Arlington <br /> <br />REGISTRATION <br /> <br />Texas P.E. No. 55972 <br />Certified Construction Contract <br />Administrator <br /> <br />PROFESSIONAL TRAINING <br />Construction Documents Technologist, CDT <br />Nuclear Moisture/Density Gauge <br />Training, NMS, Feb-2000 <br /> <br />PROFESSIONAL EXPERIENCE <br />990 - Present: Freese and Nichols <br />Associate <br />Construction Services Discipline Leader <br />990 - 1993: Resident Engineer <br />980 - 1990: Dallas Water <br />Utilities <br />979 980: Other Fir~ <br /> <br />.... <br /> <br />. City of Cleburne, Texas - Construction manager for wastewater treatment <br /> <br /> <br />-- ._--_._-------_.._---_._---------~----_._.-_.__._-~-_....--.--- _..._--_._-_.._-----~_._--_.__._---_.,---------------- _...- ---- -----~-~-- <br />~:'::...:.:..~::...:'_.._.:......:..:..:.:.:.~~~~..:~;,.:::L~~...J:~~~2~:E.?:r;<;~~~~.E~~:::~,:";.;;,~:"!0~}~~~~~~~,,~~~~~~'".:.'..~.::..._::!:'"~_:..,:._~:s~~_,~;~:~:!::.~:.:.':::~~:::~~::f.~~~~:--:::..-'::.~~__:~;~~'::"~:.:;.':'.~._:""~~~~.::=:'=~!E..~l~':_.. "_.'~ ,..,- , <br />)\'01;\/,:, ,P'-(Jrlic(:i r\~-..r,!!ft; <br /> <br />