My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:40 PM
Creation date
5/30/2002 2:14:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.4.1.2.2 <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />1. <br />1. <br />K. <br />L. <br />M. <br />N. <br />.-"~ <br />O. <br /> <br />APPENDIX C <br /> <br />CITY OF PARIS <br />POLICE FACILITY <br />ARTICLE 1.4.1.2. <br /> <br />SCOPE OF WORK - FURNITURE, FIXTURES, AND EQUIPMENT <br /> <br />Research: <br />A. Site visit current facility and documents current furniture to remain. <br />B. Incorporate existing furniture into new building. <br /> <br />Design Development: <br />A. Meet with Police and City staff to establish FF&E requirements <br />B. Coordinate FF&E requirements with architectural floor plans.. <br />C. Update Budget. <br /> <br />Construction Administration Phase <br />Meet with city staff to establish furniture standards and requirements. <br />Present standards of quality finish and staffmg hierarchy to city staff. <br />Establish and review Scope of FF&E based upon budgeting and interior <br />design constraints. <br />Present FF&E preliminary package to city staff. <br />Present final FF&E package to city staff and finalize Budget. <br />Complete specifications and drawings for purpose of bidding package. <br />Coordinate with city staff bidding package front end general conditions <br />consistent with city purchasing standards. <br />Coordinate all MEP / Dimensional issues between bid package and <br />building Construction Documents. <br />Issue package to city for city handling of the bidding process. <br />Advise Owner and Bidders on clarifications, substitutions and issuance of <br />Addenda. <br />Assist Owner in evaluating prices and make recommendation for contract <br />awards. <br />Advise Owner and Vendor(s) on clarification items following notice to <br />proceed. <br />Provide on-site representative during furniture installation. (2 days). <br />Make one (1) on site visit to review completed FF&E installation and <br />develop and process furniture punch list. <br />Make one (1) on site visit for review of completed punch list prior to <br />Owner's final acceptance. <br /> <br />~. <br /> <br />Page I of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.