My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:40 PM
Creation date
5/30/2002 2:14:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX D <br /> <br />CITY OF PARIS <br />POLICE FACILITY <br />ARTICLE 1.5.1 <br />SERVICES AND COMPENSATION <br /> <br />1.4.1.2.3 BASIC AND SUPPLEMENTAL SERVICES INCLUDED IN CONTRACT <br />SCOPE OF WORK: <br /> <br />A. Basic AlE services fee $338.000 <br />Reference Appendix A-Preliminary Project Budget <br />Fees to be billed monthly by percent complete of each Phase as follows: <br />Schematic Phase 20% <br />Design Development 20% <br />Construction Document 30% <br />Bidding 5% <br />Construction Administration 25% <br /> <br />Total <br /> <br />100% <br /> <br />The initial Building Construction Budget is set at $3,759,000 (Reference Appendix <br />"A"). This budget may be adjusted from time to time by City authorization. The <br />Architect will receive no adjustment in the fixed fee should the actual accepted <br />construction bid amount vary from the budget and subsequently be approved by City. <br /> <br />B. Professional Cost Estimating Services fee $1 LOOO <br />Detailed Cost Estimates shall be provided at Schematic and Design Development <br />phases. (10,000). <br />Architectural Coordination ($1,000). <br /> <br />C. Interior Design and FF&E selection fee $38.000 <br />Selection, specification, and installation of furniture, and related equipment will be <br />provided as part of Basic Services. Reference Appendix C. Cost of these services shall <br />be $30,000. <br />Architectural coordination of all FF&E items will be $8,000 Services to be billed by <br />percent complete. <br /> <br />~ <br /> <br />D. Acoustical. AN consultant fees $12.000 <br />Acoustical Sound Engineering and Audio Visual for training/Court Room ($11,000) <br />Architectural Coordination ($1,000). <br /> <br />,I <br /> <br />E. Civil Engineering fees $7.000 <br />Civil Engineering Services including property line/topography verification, platting, <br />site horizontal control, water and sewer plans, utility plans, drainage maps, paving <br />plans, grading plans, erosion control, and utility coordination. ($6,500). Construction <br />Administration will be provided as part of Additional Services if required. <br />Architectural Coordination ($500). <br /> <br />Page 1 of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.