My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-075-RES APPROVE/AUTHORIZE EXECUTION OF AGREEMENT WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF UARCO BUILDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:40 PM
Creation date
5/30/2002 2:14:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX E <br /> <br />CITY OF PARIS <br />POLICE FACILITY <br />ARTICLE 1.4.2 <br />SPECIAL TERMS AND CONDITIONS OF THE CONTRACT <br /> <br />1.4.2.1 CHANGE ORDERS <br /> <br />A. Owner-requested Change Orders: The Architect's fees for all work <br />associated with Owner-Requested Change Orders shall be computed on an <br />hourly basis per Appendix "0" schedule. <br /> <br />B. Unknown Site Conditions: If the Architect, having used reasonable care <br />in evaluating existing Drawings and field conditions, fmds that those <br />existing conditions are not in accordance with the Construction <br />Documents, therefore requiring additional work or cost by the Contractor, <br />the cost of the additional or changed work shall be paid by the Owner. <br />The Architect's fee for work associated with such Change Orders shall be <br />computed on an hourly basis per Appendix "0" schedule. <br /> <br />C. Omissions: If the Architect fails to include or omits an item from the <br />Contract Documents, which was fully anticipated to be included in the <br />Project, thereby necessitating the need for a Change Order, the Architect <br />will not receive a fee for work associated with the Change Order. <br /> <br />D. Design Error: If the Architect incorrectly designs or specifies an item <br />which the owner specifically requested to be part of the scope of work and <br />fails to correct the error prior to installation in the Project, thereby <br />requiring its removal or change, the Architect shall be responsible for the <br />cost to replace said item with the proper item. <br /> <br />1.4.2.2 STANDARD OF CARE/CONTINGENCY <br /> <br />...,F <br /> <br />A. In performing Architectural Services, the Architect will strive to use that <br />degree of care and skill ordinarily exercised under similar circumstances <br />by competent members of the architecture profession. Notwithstanding <br />compliance with this standard of care, the Owner can normally anticipate <br />that some changes and adjustments in the project will be required either <br />during or after construction. The Owner agrees to establish a contingency <br />fund to cover the reasonably anticipated costs of these changes and <br />adjustments as well as, changes due to code revisions and field conditions. <br />The Owner agrees to not seek costs related to item 1.4.2.1.C omissions <br />from Architect unless the aforementioned contingency funds are exhausted <br />by Non-Owner initiated changes. <br /> <br />~ <br /> <br />Page I of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.