Laserfiche WebLink
<br />ATTACHMENT C <br /> <br />RESPONSIBLlTIES OF THE RECIPIENT <br /> <br />1. Construction of abutments for the structure. <br />2. Relocation of the structure to its final location. <br />3. Setting the structure on the new abutments. <br />4. Installation of new timber decking and timber stringers. <br />5. Cleaning and painting the structure. <br />6. Repairing or replacing damaged cross bracing on the structure. <br />7. Installation of railing and other pedestrian walkway elements. <br /> <br />REIMBURSEMENT OF COSTS <br /> <br />The cost for performing the responsibilities listed above shall be born entirely by the <br />Recipient. The State will, however, reimbursement the Recipient up to $10,000 for work <br />preformed on the structure. <br />