Laserfiche WebLink
<br />TO: Mayor and City Council <br /> <br />FROM: Shawn Napier, P.E. <br />City Engineer <br /> <br />DATE: May 8, 2003 <br /> <br />MEMORANDUM <br /> <br />SUBJECT: Animal Shelter Change Order No. One <br /> <br />The following list are change order items that have been submitted by the contractor: <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br /> <br />Entry Ceiling <br />Stud walls to CMU <br />Insulated glass <br />Test hold excavation <br />Added Floor Drain <br />Slab fill change <br />Added window <br />Concrete at trenches <br />Steel Deck <br />Extend walls to roof <br /> <br />$643 <br />$507 <br />$589 <br />$3,212 <br />$746 <br />$1,432 <br />$179 <br />$955 <br />$2,966 <br />$10,742 <br /> <br />A full description is attached for the items listed above. The total change order amount for these <br />items is $21,971.00. <br /> <br />There are three deductions involving the animal shelter. The first deduction is that the Humane <br />Society will be donating $40,000 to buy kennels. The second is cabinets, shelving, a small slab <br />and fencing items will be taken out of the items to be constructed. The net deduction for these <br />items total $48,645.00. <br /> <br />The overall change order will be a deduction of $26,674. <br /> <br />cc: Michael E. Malone, City Manager <br />Larry W. Schenk, City Attorney <br />Karl Louis, Chief of Police <br /> <br />EXHIBIT .! <br />