My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-021-RES AWARDING BID; EXECUTING CONTRACT FOR CONSTRUCTION OF WATER LINES FOR NEW ELEVATED WATER STORAGE TANK - BONHAM STREET
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2003
>
2003-021-RES AWARDING BID; EXECUTING CONTRACT FOR CONSTRUCTION OF WATER LINES FOR NEW ELEVATED WATER STORAGE TANK - BONHAM STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:29 PM
Creation date
3/10/2003 8:10:19 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2003
Doc Type
Resolution
CITY CLERK - Date
1/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />] <br />] <br />] <br />] <br />] <br />] <br />] <br />] <br />] <br />] <br />] <br />] <br /> <br />~ <br /> <br />CONTRACT AGREEMENT <br /> <br />CITY OF PARIS, TEXAS <br /> <br />24" RCCP WATER TRANSMISSION LINE <br />BID NO. 82.49 <br /> <br />THIS AGREEMENT, made and entered into this day of .2003, by and <br />between the City of Paris, County of Lamar, Texas, Party of the First Part, hereinafter referred to as the <br />"City", and Party of the Second Part, hereinafter referred to as the <br />'Contractor" for the 24" RCCP Water Transmission Line. Bid No. 82.49. <br /> <br />WITNESSETH: <br /> <br />ARTICLE 1. It is hereby mutually agreed that for and in consideration of the payments as provided for <br />herein to the Contractor by the City, the said Contractor shall fumish all labor, equipment, and material <br />(except as otherwise specified above) and shall perform all work necessary to complete the <br />improvements in a good and substantial manner, ready for use, within the specified time for completion <br />of three hundred (300) calendar davs. The work shall be in strict accordance with this Contract, a <br />copy of which is filed pursuant to law in the office of the City Clerk. <br /> <br />ARTICLE 2. It is hereby further agreed that in consideration of the faithful performance of the work by <br />the Contractor, the City shall pay the Contractor the compensation due him by reason of said faithful <br />performance of the work at stated intervals and in the amount certified by the City Engineer, in <br />accordance with the provisions of this Contract. <br /> <br />ARTICLE 3. It is hereby further agreed that, at the completion of the work and its acceptance by the <br />City, all sums due the Contractor by reason of alterations or modifications of the original Contract or by <br />reason of 'Extra Work" authorized underthis Contract, will be paid the Contractor by the City after said <br />completion and acceptance. <br /> <br />ARTICLE 4. It is hereby further agreed that any reference herein to the 'Contract" shall include all <br />"Contract Documents" as the same are listed and described in Paragraph 1.9 of SECTION: GENERAL <br />CONDITIONS bound herein, and said "Contract Documents' are hereby made a part of this <br />Agreement as fully as if set out at length herein, and that this Contract is limited to the items in the <br />Proposal as signed by the "Contractor" and included in the 'Contract Documents". <br /> <br />ARTICLE 5. The Contractor agrees to perform all of the work described in the Contract Documents for <br />the unit prices and lump sums as submitted in the Bid, in the total amount of <br />($ ), taking <br />into consideration additions to or deductions from the Total Bid by reason of alterations or <br />modifications of the original quantities or by reason of "Extra Work" authorized under this Agreement in <br />accordance with the provisions of the Contract Documents. <br /> <br />ARTICLE 6. The Contractor agrees that the sum of Five hundred Dollars ($500.00) in Liquidated <br />Damages will be deducted from the Contract price by the City for each calendar day that the work <br />remains incomplete beyond the Contract time for completion, or within such extra time as may have <br />been allowed by an extension approved by the City. <br /> <br />Paris, Texas <br />24" RCCP Water Transmission Line <br /> <br />CA-1 <br /> <br />Contract Agreement <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.