My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151-RES APPROVING AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES WITH HAYTER ENGINEERING FOR PROFESSIOANL ENGINEERING/DESIGN SERVICES FOR DOWNTOWN STREETSCAPE PROJECT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-151-RES APPROVING AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES WITH HAYTER ENGINEERING FOR PROFESSIOANL ENGINEERING/DESIGN SERVICES FOR DOWNTOWN STREETSCAPE PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:42 PM
Creation date
9/29/2004 1:34:56 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
9/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />feI HAYTER <br />ENGINEERING, INC. <br /> <br />4445 S,E. LOOP 286 <br />PARIS, TEXAS 75460 <br />(903) 785-0303 <br />FAX (903) 785-0308 <br /> <br />CONSULTANTS PLANNERS ENGINEERS <br /> <br />September 3, 2004 <br /> <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75460 <br /> <br />ATTENTION: Curtis R. Fendley, Mayor <br /> <br />REFERENCE: Phase II - Downtown Streetscape Project <br />Supplemental Agreement for Professional Services <br />REI #180027-3 <br /> <br />Dear Mayor Fendley: <br /> <br />The low bid which was received on the Downtown Streetscape project was approximately <br />$150,000 under budget. With this phase almost complete we now know that funds are available <br />for a second phase to this project. This second phase will add approximately one-half block of <br />sidewalk and lighting from the N.E., S.E. & S.W. comers of the square in both directions on both <br />sides of the street. <br /> <br />Phase II will require additional professional services. Therefore, we are submitting this letter as a <br />supplement to our original agreement for review and approval. The change order to implement <br />this extra work, in the amount of $146,813.30 will represent a 24% increase in the contract with <br />Encino Landscape, Inc. Because of the magnitude of the change order TxDOT and TDLR review <br />and approval of the Phase II design will be required. The following are the services that we <br />anticipate and their cost: <br /> <br />Preliminary Engineering and Design Surveys <br />Design Phase <br />Construction Review Phase <br /> <br />5,500 <br />23,275 <br />10,750 <br /> <br />Per Section 2.6 additional services anticipated during Phase II include construction materials <br />testing, with an estimated cost being $975. Additionally, because the area of the Phase II work is <br />outside of the area defined by the original Environmental Assessment (EA), an updated EA will <br />be required to include Phase II, with an estimated cost of$I,900. <br /> <br />The terms and conditions of the original agreement also apply to this supplement. The Exhibit A <br />Schedule of Per Diem Rates will remain unchanged. <br /> <br />If this meets with Council approval, please return one signed copy. We look forward to working <br />with the City on the successful completion of Phase II. <br /> <br />EXHIBIT A- <br />
The URL can be used to link to this page
Your browser does not support the video tag.