My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-159-RES AUTHORIZING A PROFESSIONAL SERVICES CONTRACT FOR REPLACEMENT OF THE SMITH CREEK BRIDGE ON COUNTY ROAD 32900
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-159-RES AUTHORIZING A PROFESSIONAL SERVICES CONTRACT FOR REPLACEMENT OF THE SMITH CREEK BRIDGE ON COUNTY ROAD 32900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:43 PM
Creation date
9/29/2004 1:48:21 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
9/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Contract No.:COP/CEI-OOl <br /> <br />ATTACHMENT A <br /> <br />SERVICES TO BE PROVIDED BY THE CITY <br /> <br />The City shall provide the Engineer the following: <br /> <br />1. A complete surveying data for the project site: The Smith Creek Bridge on CR 32900. <br /> <br />2. A copy of the City's standards and specifications for Hydraulic Analysis and Bridge Design. <br /> <br />3. Pertinent information on the project site that may impact the final design, such as future land use <br />(upstream and downstream; any environmental issues or concerns; utility locations within the right- <br />of-way; etc.. <br /> <br />ATTACHMENT- B <br /> <br />SERVICES TO BE PROVIDED BY THE ENGINEER <br /> <br />The Engineer agrees to perform a complete bridge-class culvert design to replace the collapsed Smith Creek <br />bridge on CR 32900, including: <br /> <br />1. Hydraulic analyses of the site for the existing condition and the proposed structure. <br /> <br />2. Prepare a bridge layout, including the plan and profile for the existing bridge and the proposed structure. <br /> <br />3. Prepare complete plans, together with the appropriate specifications and estimates necessary for the <br />construction of the proposed structure by September 30, 2004. <br /> <br />The Engineer also agrees to perform revisions to the plans in response to the review comments of the City, <br />and shall perform such revisions for review comments received within 30 days after September 30, 2004, <br />when such review comments do not constitute additional work as defined in the contract. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.