My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-168-RES AUTHORIZING EXECUTION OF A RECONCILIATION CHANGE ORDER TO THE CONTRACT FOR THE CONSTRUCTION OF THE 24" RCCP WATER TRANSMISSION LINES FOR CONSTRUCTION OF THE NEW ELEVATED WATER STORAGE TANK - BONHAM STREET
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-168-RES AUTHORIZING EXECUTION OF A RECONCILIATION CHANGE ORDER TO THE CONTRACT FOR THE CONSTRUCTION OF THE 24" RCCP WATER TRANSMISSION LINES FOR CONSTRUCTION OF THE NEW ELEVATED WATER STORAGE TANK - BONHAM STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:45 PM
Creation date
9/29/2004 2:14:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
9/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Shawn Napier <br /> <br />From: <br />Sent: <br />To: <br />Subject: <br /> <br />Frank Davis [BDavis@bwrcorp.com] <br />Wednesday, July 14, 20042:22 PM <br />'s_napier@ci.paris.tx.us' <br />Water Line <br /> <br />. <br /> <br />'ARIS - WTR UNE - <br />FINALS 13JU... <br /> <br />Shawn, <br /> <br />I am attaching an excel spreadsheet which contains the sheets for <br />Estimate <br />No. 15 and then the Estimate 16 & Final. Estimate 15 needs to be <br />processed, <br />I will be sending a signed copy to you this week. <br /> <br />The Estimate 16 & Final and the Reconciliation Change Order are for <br />final <br />acceptance by the Council. The final cost is $34,959.84 over the <br />contract <br />price. This includes materials on hand that will remain with the city. <br />The <br />overrun is due mostly to additional asphalt pavement, flexible base, and <br />concrete encasements used in the trench repairs. These were needed to <br />repair the remaining portions of the streets and for the larger areas <br />needed <br />to work, and to provide additional blocking. <br /> <br />Frank <br /> <br /><<PARIS - WTR LINE - FINALS 13JUL04.xls>> <br /> <br />B. Frank Davis, Jr., P.E., R.P.L.S. <br />Project Manager <br />Bucher, Willis & Ratliff Corporation <br />601 Shelley Drive, Suite 202 <br />Tyler, Texas 75701-9439 <br /> <br />Phone: 903-581-7844 <br />Fax: 903-581-0178 <br />e-mail: bdavis@bwrcorp.com<mailto:bdavis@bwrcorp.com> <br /> <br />Notice: E-Mail Disclaimer: http://www.bwrcorp.com/edisclaim.htm <br />Bucher, Willis & Ratliff Corporation <br />http://www.bwrcorp.com <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.