Laserfiche WebLink
<br />RESOLUTION NO. 2004-031 <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, <br />PARIS, TEXAS, APPROVING AND AUTHORIZING CHANGE ORDER NO. <br />t AND CHANGE ORDER NO. 2 TO CONTRACT FOR THE 24" RCCP <br />WATER TRANSMISSION LINE; MAKING OTHER FINDINGS AND <br />PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN <br />EFFECTIVE DATE. <br /> <br />WHEREAS, the City Council of the City of Paris did heretofore, on the 13th day of <br />January, 2003, in Resolution No. 2003-021, award the contract for the "24" RCCP Water <br />Transmission Line Project" to Buster Paving, a Division of APAC-Texas, Inc.; and, <br /> <br />WHEREAS, the City Engineer, Shawn Napier, acting as project engineer, recommends <br />the amendment of the contract for said project to procure the professional services of Hanson <br />Concrete, Inc.; to procure the professional services ofTDW Services, Inc.; to furnish an 18" cut- <br />in valve; and to procure contractor labor and equipment, all of which are related to the water main <br />break in September 2003, and to additionally install a storm sewer c1eanout; install a 12" SDR-35 <br />and connections; furnish and install inlets with grates; and purchase flowable fill; all of which are <br />covered by the allowance for construction contingency, and providing for no increase in the <br />contract price; and, <br /> <br />WHEREAS, the forms of Change Order No. 1 and Change Order No.2, attached hereto <br />as Exhibits A and B, respectively, should, in all things, be approved, and the Mayor should be <br />authorized to execute the same, NOW, THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, <br />TEXAS: <br /> <br />Section 1. That the findings set out in the preamble of this resolution are hereby in all <br />things approved. <br /> <br />Section 2. That the form of Change Order No.1 to Contract for the "24" RCCP Water <br />Transmission Line Project," attached hereto as Exhibit A, to procure the professional services of <br />Hanson Concrete, Inc.; to procure the professional services of TDW Services, Inc.; to furnish an <br />18" cut-in valve; and to procure contractor labor and equipment, all of which are related to the <br />water main break in September 2003 and which are covered by the allowance for construction <br />contingency, and providing for no increase in the contract price, be, and the same is hereby, <br />approved. <br /> <br />Section 3. That the form of Change Order No.2 to the Contract for the "24" RCCP Water <br />Transmission Line Project, " attached hereto as Exhibit B, to install a storm sewer c1eanout; install <br />a 12" SDR-35 and connections; furnish and install inlets with grates, and purchase flowable fill; <br />which are covered by the allowance for construction contingency, and providing for no increase <br />in the contract price, be, and the same is hereby, approved. <br />