My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-032-RES ACCEPTING PROPOSAL OF FREESE AND NICHOLS, INC FOR PROFESSIONAL SERVICES
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-032-RES ACCEPTING PROPOSAL OF FREESE AND NICHOLS, INC FOR PROFESSIONAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:21 PM
Creation date
4/26/2004 3:13:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
2/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FREESE AND <br />NICHOLS: <br /> <br />HELPING YOU <br /> <br />PROTECT YOUR <br /> <br />WATER SUPPLY <br /> <br />Innovative approaches. , <br /> <br />.. <br /> <br />F'.... .rtd Nichol. <br /> <br />practical results <br /> <br />The following projects represent recent VIAs and associated surveillance and <br />security system projects: <br /> <br />Surveillance and Security System Improvements <br />Wesley Seale Dam/Choke Canyon Dam/Pump Station <br /> <br />~ <br /> <br />- - <br />- - <br /> <br />FNI designed a system that will provide video surveillance and access <br />security at two large high-hazard dams, one small dam, and two water <br />transmission pump stations. FNI is also providing representation <br />services while the project is in construction. The design included the <br />identification of critical points in the system to be monitored or <br />secured, siting of video cameras based on the viewing coverage needed, and the <br />selection and specification of the surveillance and security hardware and software. <br /> <br />~ <br /> <br />The project also includes renovations to an existing building to create an <br />Emergency Operations Center at one of the large dams to provide remote <br />monitoring of the other sites. The design of the remote monitoring network <br />included the selection of a telecommunications architecture that would be cost- <br />effective and still provide the required surveillance. <br /> <br />Vulnerability Assessment and Security Inspections AEP Power Plant <br /> <br />Dams a <br />American Electric Power Company, Texas j . <br />FNI was hired by the American Electric Power Company to conduct <br />security inspections at five power plant cooling water dams located in <br />Texas, Arkansas and Louisiana. The inspections consisted of a review of the project <br />plans, a site visit and a letter report of observations, conclusions and <br />recommendations. The report identified the portions of the facilities that were most <br />vulnerable to attack by terrorists and recommended methods and procedures to <br />mitigate these vulnerabilities. <br /> <br />Vulnerability Assessment and Emergency Respome Plan SOQ <br /> <br />page 1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.