My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-032-RES ACCEPTING PROPOSAL OF FREESE AND NICHOLS, INC FOR PROFESSIONAL SERVICES
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-032-RES ACCEPTING PROPOSAL OF FREESE AND NICHOLS, INC FOR PROFESSIONAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:21 PM
Creation date
4/26/2004 3:13:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
2/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Innovative approaches. . <br /> <br />.. <br /> <br />Fr.... _nod Nichol. <br /> <br />practical results <br /> <br />Tina E. Hanson, P. E. <br />Project Manager <br /> <br />Years Experience: <br />Reg istrations: <br />Education: <br /> <br />1 8 <br />Professional Engineer, Texas 1990 (#67820) <br />B.S., Civil Engineering, The University of Texas at <br />Arlington, 1985 <br />M.E., Civil Engineering, The University of Texas at <br />Arlington, 1993 <br /> <br />Ms. Hanson's environmental and civil engineering experience includes <br />environmental assessments, feasibility studies, and remedial action plans; municipal <br />solid waste, water and wastewater treatment permitting, process evaluation, plant <br />design, plant operation and maintenance; sludge handling and disposal facilities; <br />industrial wastewater treatment facilities; and construction management services. <br /> <br />Project Experience: <br /> <br />Woter System Vulnerability Assessments - Brown County WID # 1, Cities of <br />Abilene, Beaumont, Co rro lito n, Denton, Corpus Christi, Garland, Irving, <br />Midlothian, Piano, North Richland Hills, San Angelo and Temple Texas. Prepared <br />Water Utility Vulnerability Assessments and new Water Utility Emergency Operations <br />Plans, Recommended physical improvements and operational and procedure <br />changes. The Water Utility Emergency Operations Plans included procedures to <br />respond to various levels of terrorist threat in response to the National Homeland <br />Security Advisory System Threat Conditions and specific incident response plans. <br /> <br />East Side Water Treotment Plant Vulnerability Assessments - City of Da/las, <br />Texas - The assessment identified vulnerable system components. Failures of system <br />components were analyzed for the impact on the City's ability to deliver treated <br />water to the system, Improvements to increase reliability were prioritized for inclusion <br />in the City's capital improvement program. <br /> <br />Risk Management Progroms - City of Son Angelo, Texas and 20+ other <br />facilities. Prepared chemical release prevention programs including hazard reviews, <br />off-site consequence analyses and detailed computer modeling of chemical release <br />scenarios, emergency planning, and process safety; and submitted Risk <br />Management Plans for facility compliance for chemical systems. Facilities included <br />TRA Central Region Wastewater System and Fort Worth's Village Creek WWTp, two <br />of the largest wastewater treatment plants in the DFW metroplex. <br /> <br />Preporedness ond Prevention Manual, Contingency Pion, ond Emergency <br />Procedures - Gold Recovery Facility - Preparedness and Prevention Manual, <br />Contingency Plan, and Emergency Procedures. <br /> <br />Sofety Evoluotions - City of Fort Worth, Texas - Safety evaluation of chlorination <br />facilities at remote booster pump stations and storage tanks. <br /> <br />lake Roy Roberts Water Treatment Plant - City of Denton, Texas - Project <br />engineer for the design of a splitter box, blower building, and 25 MGD transfer <br />pump station for a new 20 MGD Lake Ray Roberts Water Treatment Plant. The <br />blower building design included two multi-stage centrifugal air blowers, field piping, <br />and related fittings and appurtenances. <br /> <br />Water System Vulnerability Assessment and Emergency Response Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.