My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-20-PEDC
City-of-Paris
>
Boards and Commissions
>
PEDC
>
1993-2016
>
2002
>
2002-11-20-PEDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:44 PM
Creation date
2/6/2003 6:58:19 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Minutes
CITY CLERK - Date
11/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gary Vest <br />Proposal for Master Planning Services <br />Paris Business Park <br />November 19, 2002 <br />PAGE 5 <br /> <br />V. ADDITIONAL SERVICES <br /> <br /> Unless otherwise noted in this proposal, services described in this section are not included in <br /> basic planning services and will be billed on an hourly basis to PEDC. Optional Additional <br /> Services should first be approved by PEDC. If Contingent Additional Services are required <br /> because of circumstances beyond Graeber, Simmons & Cowan's control, Graeber, Simmons & <br /> Cowan will notify PEDC prior to commencing such services. If PEDC deems that such services <br /> described as Contingent Additional Services are not required, PEDC will provide prompt written <br /> notice to Graeber, Simmons & Cowan and thereby release Graeber, Simmons & Cowan from <br /> any obligation to provide those services. <br /> <br /> A. CONTINGENT ADDITIONAL SERVICES <br /> <br /> 1. Providing services to verify the accuracy of drawings or other information <br /> furnished by PEDC. <br /> <br /> 2. Making revisions in drawings, schedules, specifications, or other documents <br /> based on programming or design changes when such revisions are inconsistent <br /> with written approval or instructions previously given, Or are required because <br /> of revisions in codes, laws, or regulations subsequent to the preparation of such <br /> documents, or required as a result of PEDC's failure to render decisions in a <br /> timely manner. <br /> <br /> 3. Preparing drawings, specifications, and other documentation and supporting <br /> data, evaluate the contractor's proposals, and provide other services in <br /> connection with change orders and construction change directives. <br /> <br /> 4. Providing services related to evaluating substitutions proposed by the contractor <br /> and to revising drawings, specifications, and other documentation resulting <br /> therefrom. <br /> <br /> 5. Preparing documents for alternate, separate or sequential bids and providing <br /> out-of-sequence services requested by PEDC. <br /> <br /> 6. Providing consultation concerning replacement of work damaged by fire or <br /> other causes during construction, and providing services required in connection <br /> with the replacement of such work. <br /> <br /> B. OPTIONAL ADDITIONAL SERVICES <br /> <br /> 1. Providing financial feasibility or other special studies. <br /> <br /> 2. Providing planning surveys, evaluations or comparative studies of prospective <br /> sites or buildings. <br /> <br /> 3. Providing services involving travel for the purpose of evaluating systems or <br /> materials proposed for the project. <br /> <br /> 4. Coordinating construction performed by separate contractors or by PEDC's own <br /> forces, and coordinating services required in connection with construction <br /> performed and equipment supplied by PEDC. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.