Laserfiche WebLink
<br />Paris Business Park DEVELOPMENT STANDARDS <br />Paris, Texas Paris Economic Development Corporation <br /> <br /> <br /> 2.4.7 PROPERTY IMPROVEMENT SUBMITTAL FORM <br /> <br /> <br />Paris Business Park SUBMITTAL FORM <br /> <br />Date: Property: Lot Number , Block- <br />Type of Improvements: <br /> [] New Building(s) <br /> [] Addition of Existing Building(s) <br /> [] Renovation of Existing Building(s) <br /> [] Landscaping or Sitework <br />. [] Other: <br /> <br /> NOTE: You are not required to submit a form if you are only making repairs, doing maintenance or <br /> making a replacement-in-kind of existing features. <br /> <br />Construction start date: Fast Track [] Yes [] No <br /> <br />Date of move in: <br /> <br />The following documents (EXHIBIT A) are attached: <br /> (Mark all that apply.) <br /> [] Design Drawings, Outline Specifications. Schedule and Budget <br /> [] Construction Drawings (including Site Plan, Floor Plan(s), Elevations, Sections and Details) and <br /> Product Specifications <br /> [] Record Documents showing completed Construction Work <br /> <br />I hereby certify that, to the best of my knowledge and understanding, these documents are: <br /> <br />0 Complete and in full compliance with all provisions of the Development Standards of Paris Business Park. <br /> <br /> OR <br /> <br />0 In compliance with all provisions of the Development Standards of Paris Business Park except that I request <br /> a variance for the conditions indicated in attached EXHIBIT B. <br /> <br />NOTE: Provide a list of any known deviations from the Development Standards, the reasons for each deviation, <br /> and any mitigating factors. <br /> <br />These documents are submitted for review and approval of the Development Review Board of the Paris Economic <br />Developmènt Corporation. <br /> <br /> Property Owner orAuthorized Representative Date <br /> (Attach a letter of authorization.) <br /> <br />DRB REVIEW: (Applicant, do not write berow this line.) <br /> <br />We have carefully reviewed the submitted documents and they are: <br /> <br /> [] approved without exception, proceed. <br /> [] approved based on the attached list of required changes. <br /> [] returned for correction/completion based on the attached list of required changes. <br /> <br /> DRB Representative Date <br /> <br /> <br /> <br />Graeber, Simmons & Cowan Page 6 of 30 1/9/03 <br />200209400 <br />