My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-014-PEDCR
City-of-Paris
>
City Clerk
>
PEDC
>
Resolutions
>
2003
>
2003-014-PEDCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:30 PM
Creation date
5/19/2004 2:07:04 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2003
Doc Type
Resolution
CITY CLERK - Date
12/17/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> STANDARD FORM OF AGREEMENT <br /> <br />THE STATE OF TEXAS <br />COUNTY OF LAMAR <br /> <br />THIS AGREEMENT, made and entered into this 17th day of December, AD. 2003. <br />by and between Paris Economic Development Corporation, of the County of Lamar and State of Texas, <br />hereinafter termed "OWNER", and Stephens & Sons Concrete Contractors, Inc. of the City of Paris, <br />County of Lamar , State of Texas , Party of the Second Part, hereinafter called <br />"CONTRACTOR". Official contracts on behalf of OWNER and CONTRACTOR shall be made to the following <br />persons at the addresses shown: <br /> <br />OWNER"S CONTACT PERSON CONTRACTOR'S CONTACT PERSON <br /> <br />Name: Gary Vest Name: Todd Stephens <br />Address: 1125 Bonham Street Address: 4725 Lamar Avenue <br /> Paris, Texas 75460 Paris, Texas 75460 <br />Phone: (903) 784-2501 Phone: (903) 785-0430 <br />Fax: (903) 785-2503 Fax: (903) 785-4420 <br /> <br /> <br /> WITNESSETH: <br /> <br />THAT FOR AND IN CONSIDERATION of the payments and agreements set forth in this Agreement <br />to be performed by OWNER and under the conditions expressed in the bond beanng even date herewith, <br />CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain <br />improvements described as follows: <br /> <br />PARIS INDUSTRIAL PARK, 30th STREET AND PARK STREET, <br />PAVING, DRAINAGE, AND UTILITIES CONSTRUCTION <br /> <br />and all extra work In connection therewith, under the terms as stated in the General Conditions of the <br />Agreement and at CONTRACTOR'S cost and expense to furnish all materials, supplies, machinery, <br />equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to <br />complete the said construction, in accordance with the conditions and prices stated in the Proposal attached <br />hereto, and in accordance with the Notice to Bidders, General and Special Conditions of Agreement, Plans <br />and other drawings and printed or written explanatory matter thereof, and the Specifications and addenda <br />therefor, as prepared by Adams Consulting Fngineers, Inc, hereafter called "THE ENGINEER", each of <br />which has been Identified by the CONTRACTOR and THE ENGINEER, together with CONTRACTOR'S <br />written Proposal, and the General Conditions of the Agreements hereto attached; all of which are made a <br />part hereof and collectively evidence and constitute the entire Contract. <br /> <br />SF-1 <br /> <br />EXHIBIT 1l. <br />
The URL can be used to link to this page
Your browser does not support the video tag.