Laserfiche WebLink
<br />Mr. Gary Vest <br />Proposal for Master Planning Services <br />Paris Business Park <br />November 19, 2002 <br />PAGE 2 <br /> <br />III. <br /> <br />OWNER'S RESPONSIBILITIES <br /> <br />A, <br /> <br />B. <br /> <br />c. <br /> <br />D. <br /> <br />PEDC will provide full information regarding requirements of the project, including <br />PEDe's design objectives, constraints and criteria, and project scope requirements. <br /> <br />PEDC will designate a representative authorized to act in the Owner's behalf with <br />respect to the project. The representative shall be responsible for all Owner-provided <br />information, data and decisions, including examination of the GS&C Team's work <br />product submitted, and render decisions pertaining thereto promptly to avoid <br />unreasonable delays. <br /> <br />PEDC will provide record documents of existing conditions at the proposed site, <br />including a certified property survey indicating the property boundaries, topography, <br />trees, rights-of-way, streets and roadways adjacent to the site, easements, <br />encroachments, deed restrictions, zoning, and utility plans of all utilities located on or <br />adjacent to the proposed site, including location, size and depth above or below grade. <br />The Owner-provided information shall also include locations, dimensions and complete <br />data pertaining to existing buildings or parts thereof, foundations, pipelines, driveways, <br />sidewalks, and other improvements. PEDC will provide copies of all environmental <br />surveys and assessments that have been performed related to the site. <br /> <br />PEDC shall furnish other services, information, surveys and reports as may be <br />considered within the standards of the industry, if required in order for the project to be <br />accomplished, Such information and services, and approvals and decisions, shall be <br />rendered as expeditiously as possible for the orderly progress of the project. <br /> <br />IV. <br /> <br />MENU OF BASIC SERVICES - Following is an outline of specific proposed master planning <br />servin's, time required, deliverables and associated fees. <br /> <br />A. <br /> <br />BUSINESS PARK MASTER PLAN <br /> <br />1. <br /> <br />Consult with PEDC to determine the goals, objectives, and requirements of the <br />project and projected budgets. <br /> <br />2, <br /> <br />Review existing land development ordinances, deed restrictions and other <br />restrictions or limitations to development and, in general, become familiar with <br />the pertinent development regulations. <br /> <br />3. <br /> <br />Review the requirements for elements such as existing and proposed future <br />roadways, planned subdivision lots and utility infrastructure, both existing and <br />future. We anticipate that consultation and review for items 1 and 2 above will <br />consist of one two-hour meeting with Paris Economic Development <br />Corporation. <br /> <br />4. <br /> <br />Determine the feasibility of achieving PEDe's requirements by examining <br />drawings and specifications of existing conditions or conducting site visits of <br />the proposed site. <br /> <br />5. <br /> <br />Prepare, for approval by PEDC, plans, sketches and other documentation as <br />may be deemed necessary to indicate the proposed land uses, lot sizes and <br />locations, and roadway and utility locations. The proposed plan will be <br />reviewed with PEDC during one two-hour meeting to finalize all plans. <br />