Laserfiche WebLink
N l L t.-I f~Q SCbi-ITRPCTD0Name) <br />From: <br />F-~ iAddress) <br />2'. (Address) <br />Re: March 1, 2009 - March 1, 2010 Demolition and construction of Curb/Gutter, Driveway <br />Approaches and Reinforced Concrete Sidewalk. <br />Pursuant to and in compliance with your bid specifications for the demolition and construction of <br />Curb/Gutter, Driveway Approaches and Reinforced Concrete Sidewalk, we bid the following: <br />• Please submit all bids in unit prices not lump sum per the estimated quantities provided. <br />. <br />$ 21 ,S D per foot for typical curb and gutter installation (city standard) <br />4500 L.F. <br />$ C) Removal and Disposal per L.F. <br />$ 2~p ,~~C) Total price for 6" typical curb and gutter (sum of the other two prices) <br />$ 2.q S-d per foot for curb and gutter to match existing curb style installed <br />(ie. WPA style curb) 50 L.F. <br />$_(~'oo_ Removal and Disposal per L.F. <br />$ 3~,!SQ Total price for WPA curb and gutter (sum of other two prices) <br />DO per square foot for the standard residential driveway approach installation <br />(city standard) 4000 S.F. <br />$ U 0 Removal and Disposal per S.F. <br />$ DO Total price for driveway approach (sum of the other two prices) <br />$ Z~ per square foot for reinforced concrete sidewalk (city standard) <br />2500 S.F. <br />$ ' sD Removal and Disposal per S.F. <br />~ ~.I S Tota] price for sidewalk replacement (sum of other two prices) <br />B <br />Y <br />Dated the J e O of / iE B 2 U A~`t 12009. <br />Title: 6s-nmA--r0~ <br />EXHiBIT <br />lb 0 0 0 C. 4 J <br />