My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22 Fiscal management
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
03 March
>
2009-03-09
>
22 Fiscal management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:49:08 AM
Creation date
3/6/2009 4:26:42 PM
Metadata
Fields
Template:
AGENDA
Item Number
22
AGENDA - Type
MISCELLANEOUS
Description
22 Fiscal management
AGENDA - Date
3/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Texas Water Development Board <br />SFY 2010 CWSRF IUP Solicitation Packet <br />Project Information Form <br />Name of Entity: City of Paris <br />Section RATING • - . . pertain only . - . project. <br />Nonpoint Source Pollution Control and Estuary Management projects may skip to Section 9. <br />A. <br />Enforcement Action <br />Yes <br />No <br />Is the work required by a schedule imposed by court order, EPA administrative order, or TCEQ <br />" <br />J <br />attach a copy of the order. <br />enforcement order? If "Yes, <br />B. <br />Unserved Area <br />Yes <br />No <br />1. Does your principal project involve extending service (centralized or altemative system) to <br />populated areas of an existing developed community that are not served by a centralized <br />~ <br />colfection system? <br />2. Has a public health official found that a nuisance dangerous to public health and safety <br />exists resulting from water supply and sanitation problems in the area to be served by the <br />~ <br />proposed project? If "Yes," attach a letter from TCEQ or a Public Health Official to <br />document the nuisance. <br />C. <br />Innovative and Alternative <br />Yes <br />No <br />Will the principal project include innovative or alternative types of collection or treatment <br />technology as defined below? <br />• Alternative Technology (TAC Sec. 375.2(4)) <br />Proven wastewater management techniques which provide for the reclaiming and reuse of <br />water, productively recycle wastewater constituents, or recover energy. Specifically, <br />alternative technology includes: land application of effluent and sludge, aquifer recharge, <br />aquaculture, direct reuse, horticulture, revegetatian of disturbed land, containment ponds, <br />J <br />sludge composting and drying prior to land application, self-sustaining incineration, <br />methane recovery, individual and onsite systems, and small diame#er pressure and <br />vacuum sewers and small diameter gravity sewers carrying partially or fully treated <br />wastewater. <br />• Innovative Technology (TAC Sec. 375.2(47)) <br />Nonconventional methods of treatment such as rock reed, root zone, ponding, irrigation, or <br />other technologies which represent a significant advance in the state of the art. <br />D. <br />More Stringent Effluent Limits <br />Yes <br />No <br />Does the principal project involve more stringent permit limitations? If "Yes," attach a copy of <br />~ <br />your new discharge permit or a letter from TCEQ stating the new limits. <br />E. <br />Regi <br />onal Projects <br />Yes <br />No <br />1. <br />Does the principal project result in removing one or more existing WW'tPs from service, <br />J <br />thereby reducing the number of plant outfalls? <br />2. <br />Is the principal project a trunk sewer that will convey wastewater from a plant that will be <br />~ <br />removed from service to an existing treatment plant? <br />3. <br />Is the principal project a trunk sewer to an existing or developing area that will convey <br />' <br />~ <br />fP, thereby avoiding the construction of a separate <br />wastewater to an existing WW <br />treatment facility? <br />4. <br />Will the principal project expand an existing regional facility to receive flow from another <br />J <br />community rather than create or continue use of a separate wastewater treatment facility? <br />If "Yes" to ANY of the above questions, attach a map showing the existing service area along with the proposed expanded or <br />altered service areas resulting from this project. <br />F. <br />Implementation of Regional Plans <br />Yes <br />No <br />1. <br />Does the principal project implement a regional facility plan for water resources funding in <br />~ <br />whole or in part by a grant from TWDB? <br />2. <br />Does the principal project implement a TCEQ regionalization or consolidation plan? <br />~l <br />3. <br />Does the principal project implement other plans developed by state regional entities <br />~ <br />pursuant to legislative authority? <br />If "Yes" to ANY of the questions in <br />Section 7.F., list plan name and sponsor: <br />AND attach the plan's executive summary and any other material needed to show that the proposed principal project <br />implements the plan. <br />FOffll C.W-007 (10/08) w OPP231i 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.