Laserfiche WebLink
Texas Water Development Board <br />SFY 2010 DWSRF IUP Solicitation Packet <br />Project Information Form <br />Name of Entity: City of Paris PWS ID No.: 1390002 <br />Section PROJECT . • <br />The principaf project consists of one or more canstruction projects that are intended to adtlress specific system conditions. The cost <br />of the principal project must be greater than 50% of the cost of all projects inGuded on the Project Information Form (see Section 7 <br />for listing additional projects). If an entity has multiple principal projects, please submit individual forms for each-principal project. <br />Provide a brief description of the principal project and how it will address the items in Section 6 to which'you respond <br />"Yes." <br />Current Health and Compliance Factor and/or <br />MCL Violations and Physical Deficiencies <br />Proposed Project Solutions <br />Cost Category <br />(See Guidelines.) <br />1. Documented outages <br />Replace old CI lines <br />B <br />2. Disinfection <br />Replacing old CI lines and looping <br />B <br />5. a. & b. Low system pressure <br />Replace old CI lines with larger <br />diameter lines <br />B <br />6. Water loss <br />Replace old CI lines <br />B <br />Water tower deteriorated <br />Repair and repaint elevated tank <br />D <br />Section RATING • . . pertain only . the . project. <br />Total Storage Capacity (in gallons) Total Production Capacity (MGD) <br />Please attach any documentation that supports the responses to the following questions. (Refer to <br />TCEQ notice of violation letter, if applicable.) <br />Yes <br />No <br />1. <br />Has your system experienced documented autages in the water distribution system? <br />,I <br />2. <br />Does the system lack adequate disinfection? <br />~ <br />3. <br />Is the system's documented water production capability less than 85% of the minimum required by <br />TCEQ? <br />~ <br />4. <br />Is the system's documented treated water storage capacity less than 85% of the minimum required by <br />TCEQ (including total storage, elevated storage, andlor pressure tank)? <br />J <br />5. <br />Has the system experienced documented instances of water distribution pressures: <br />Yes <br />No <br />a. <br />less than 20 PSI? <br />~ <br />b. <br />less than 35 PSI? <br />~ <br />6. <br />Is the system experiencing documented water distribution losses of greater than 25%? <br />~ <br />7. <br />Has your system experienced documented instances of water contaminants exceeding the primary or <br />secondary maximum contaminant level (MCL)? <br />J <br />Benefits to Other Public Water Systems - Consolidation Projects <br />Yes <br />No <br />8. <br />Will the proposed principal project benefit any other public water systems (i.e., one you are currently <br />serving or propose to serve)? <br />• If you answer "Yes," you must also submit the Consolidation Project Worksheet (DW-009) for <br />each water system that will benefit from this project. <br />• If you answer "No," skip to Section 7. <br />J <br />Name of Public Water System <br />Currently Served <br />Propose to Serve* <br />that Will Benefit from This Project <br />PWS ID No. <br />Yes <br />No <br />Yes <br />No <br />* You must attach written documentation of the agreement with the PWS that you propose to serve. <br />Form DW-007 (10/08) 000228 2 <br />