My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 Plat approval, variance, easement acceptance and subdivision improvements
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
03 March
>
2009-03-09
>
08 Plat approval, variance, easement acceptance and subdivision improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:45:39 AM
Creation date
3/9/2009 4:28:43 PM
Metadata
Fields
Template:
AGENDA
Item Number
08
AGENDA - Type
MINUTES
Description
08 Plat approval, variance, easement acceptance and subdivision improvements
AGENDA - Date
3/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zo ing Commission <br />FROM: Shawn Napier, : <br />City Engineer tor of Public Works <br />DATE: December 31, 2008 <br />SUBJECT: Pecan Place Preliminary Plat <br />I have reviewed the final plat of the above referenced addition. It appears that the final plat <br />complies with the City of Paris subdivision regulations with the following exceptions. <br />1. Submit a corrected preliminary plat with all of the requested corrections. <br />2. Submit the offsite utility easements (legal description and drawings), these must be <br />approved concuxrently with the final plat. <br />3. The guarantee of construction form must be completed and approved concurrently with <br />the final plat. <br />4. The field notes have an error in that one call includes the five (5) foot Right-of-Way <br />(ROW) dedication and the other call does not. <br />5. Replace the points on lot 6 with a curve and set iron rods instead of points, also change <br />the field notes to include the curve. <br />6. Remove the "Point=Unmonumented Cor." from the legend, every corner in a subdivision <br />shall have a set monument. <br />7. The plat for Windsor Estates shows a wider ROW than what is shown. Please submit the <br />survey information that shows monuments in the properties on the other side of Pine Mill <br />Road. <br />8. Continue the 10-foot utility easement along the entire frontage of Pine Mill Road. Lots <br />2-5 show a 25-foot access and utility easement, this should be a 25-foot building line and <br />a 10-foot utility easement. <br />9. Add a 10-foot utility easement between lots 4 and 5 from Pine Mill Road to Lot 10. <br />10. The pre-development vs. post-development runoff calculations presented show an <br />increase of 4 cfs (cubic feet per second), please show how this additional flow will be <br />mitigated. State law does not allow for any increased runoff to an adjoining neighbor. <br />I recommend approval of the final plat upon submission of a corrected mylar copy with <br />signatures of the surveyor and owners prior to noon on March 9, 2009. If the corrected plat is <br />not submitted by this time the plat will be denied. <br />cc: Kevin Carruth, City Manager <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />Wayne Brown <br />4J1~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.