Laserfiche WebLink
From. . l L L~ A~L n f~ 1-1 flSO'ASCbi-1Ini-K-TOQ~Name) <br />~ <br />4~ 3S LA rn A~ -Pf ~V-1 vP-~ (Address) <br />(Address) <br />Re: March 1, 2009 - March 1, 2010 D~mo~ S d~a~nstruction of Curb/Gutter, Driveway <br />Approaches and Reinforced C <br />Pursuant to and in compliance with yow' bid specifications for the demolition and construction of <br />Curb/Gutter, Driveway Approaches and Reinforced Concrete Sidewalk, we bid the following: <br />. Please submit all bids in unit prices not lump sum per the estimated quanhties provided. <br />gutter installation (city standard) <br />• <br />$ Z~ ,s D per foot for typical curb and <br />4500 L.F. <br />$ S. 00 Removal and Disposal per L.F. <br />~ Total price for 6" typical curb and gutter (sum of the other two prices) <br />er foot for curb and gutter to match existing curb style installed <br />$ Z4 . so p <br />(ie. WPA style curb) 50 L.F. <br />$ ,(D Q Removal and Disposal per L.F. <br />30,50 <br />Total price for WPA curb and guttei' (sum of other two prices) <br />C)O per square foot for the standard residential driveway approach installation <br />$ <br />(city standard) 4000 S.F. <br />s I~u c) Removal and Disposal per S.F. <br />$ -~J- DO Total price for driveway approach (sum of the other two prices) <br />per square foot for reinforced concrete sidewalk (city standard) <br />$ <br />2500 S.F. <br />$ ~ 5D Removal and Disposal per S.F. <br />3.1 S Total price for sidewalk replacement (sum of other two prices) <br />$ <br />m ~ Ti#le: T'► <br />By <br />ZAa- <br />'390 of /_R QU A R <br />Dated the 2009. <br />EXHIBITB- <br />