Laserfiche WebLink
1.6 The Contractor shall provide i Checki st" f attched and/or <br />Full <br />project as specified m the Insurane <br />limits of insurance required by the checkiist attached shali be available for <br />claims arising out of this contract and/or project. <br />1.7 The Contractor covenants to save, defend, hold harmless and indemnify <br />the City and its elected officials, officers and employees (col1ectiVely the <br />"City") from and against any and all claims, loss, damage, injury, cost <br />(including court costs and attome)'s fees), charges, liability or exposure, <br />however caused, resulting from or arising out of or in any way connected <br />with the Contractor's perFormance or non-performance of the terms of the <br />Contract Documents or its obligations under the Contract. This <br />indemnification shall continue in full force and effect until the Contractor <br />completes all of the work required under the Contract, except <br />or <br />indemnification shall continue for all claims involving p oducts <br />completed operations after final acceptance of the work by the City for <br />which the City gives notice to the Contractor after the City's final <br />acceptance of the work. <br />1.8 The Contractor shall be responsi for all mawork tenals rftoots ~ equ~pment, <br />contract and every part thereof, and <br />appliances, and property of any and all descriptions used in connection <br />with -the work. The Contractor assumes all risks for direct and indirect <br />damage or injury to the property or persons used or employed on or in <br />connection with the work contracted for, and of all damage or injury to any <br />person or property wherever located, resutting from any action, omission, <br />commission or operatio a~ed ork(, u~tia n,al accepta ce'of the work by <br />whatsoever with the con <br />the City. <br />1.9 Insurance coverage required in these t e'fContractor failbto' prov de <br />throughout the Contract Term Should <br />acceptable evidence of current insurance within seven (7) days of written <br />notice at any time during the Corrtract Term, the City shall have the <br />absolute right to terminate the Contract without any further f b the enti e <br />the Contractor, and the Contractor shatl be liable to the City <br />of performing the <br />additional cost of procuring perForma~e of termination, <br />mcomplete portion of the Contract at <br />1.10 Contractual and other liability insuranceo re~d rsethis rvicesntexclus onl <br />not contain a supervision, mspection 9neerig <br />that would preclude the City from supervising or inspecting the project as job to the end result. The Contractor shatl assume ed by t and of <br />responsi bi l i tie s a s t o t h e c o ne%n emp~oyedirby t e su Icontractor. <br />the subcontractors and a y p <br />